Загрузка страницы

W & S Expansion! Megapack Site Growing & Entrance Changes! 8 May 2023 Giga Texas Updates (08:15AM)

Gigafactory Texas on 8 May 2023! This is where Model Y’s are built and soon Cyber Truck production will start!

This morning was not too bad to fly, with low ceilings, a little mist, but light winds and diffuse lighting for most of the video. We see some new earthwork areas on the west side of the highway, now connecting the new clearing area on the south with the material staging area on the north. It appears more earthwork to develop this entire side of the highway may now be underway.

Timestamps:
Drone flight overview with discussion & illustration: 0:06 to 4:15
Drone flight footage & infographics: 4:21 to 29:18

In the video intro, I discuss the upcoming Shareholders meeting, my 7 May Megapack deep-dive video and progress on the Megapack site this morning, with many observed changes and continued conduit installation. I also discuss the west side earthwork and graded section changes. Finally, I discuss the progress on the south end graded area that will allow for the building extension. This includes showing the more than 100 GeoPiers already completed and the Continuous Flight Auger Pile progress on the southeast corner of the stamping structure.

Additional highlights and details form today flight include:
The west side of the building shows many new developments, including the removal of the shiny steel nitrogen tank that was supporting the 4680-production area. We also see a new exit for Model Y's, using a temporary black steel ramp just north of the main entrance. There were about a dozen Model Y's here, and I saw at least four drive out of the building at this location. Perhaps this is a new exit point? Unsure and will need to monitor in the future.

The west main entrance continues to see a lot of work, particularly with concrete pours, landscaping, and work to prepare for the stainless-steel cladding on the steel "tunnel" sections emanating away from the glass main doors.

Crews continue to apply the white concrete wall stain along the entire front (large) window sections, and at least one window has been removed near this area. Farther south, the temporary loading platform was busy, with more materials and what appears to be a fan unit of some kind being hoisted up and moved inside where the windows had been removed.

The south end grade work seems to be nearly completed, while GeoPiers have now added well over 100 piers in the middle area of the graded section. On the east side, just south of the stamping machine structure, more Continuous Flight Auger Piers are being constructed.

The horizontal drilling near the south bridge continues, and more work is visible on the south bank of the Colorado river.

The Megapack construction site is a hive of activity, from more trenching, conduit installation and red concrete conduit topping being applied under the power lines and extending past the south end of the Megapack site itself. Related to this, the berm on the northeast side of casting continues to be widened, plastic sheeting has been applied to prevent rain erosion, while more conduit installation takes place. This connects underneath Tesla Road to the conduit being installed near the Megapack site.

Near the Die Shop and the temporary lined pond, we see more trenching and conduit installation, progressing towards the west and now under the road to the Martin Marietta batch plant. This will connect to the Megapack conduit installation, bringing power to the Die Shop and Battery Cathode plants.

The Die shop exterior wall installation on the west side continues, and the deep foundation is now surrounded by some poured final ground slab, while other forms for the perimeter grade bean and rebar sections for ground slab await further concrete pours.

The Cathode plant east side shows the 7-story tall, assembled platform with equipment now has steel cable tie downs anchored into the trapezoidal concrete ramp. This is likely a temporary setup until this platform can be moved inside and installed.

Thank you for watching and I hope this has been informative, educational, and entertaining for you. If you would like, please consider supporting me via Patreon (link is in the description of this video and in the video itself) so I can continue to make and share these incredible videos.

Follow me on
Patreon https://www.patreon.com/joeslastchancegarage
Twitter @JoeTegtmeyer
Instagram (Joe’s Last Chance Garage) for the latest updates: #joeslastchancegarage
Facebook Joe Tegtmeyer and Joe’s Last Chance Garage

Be sure to check out additional Texas Gigafactory footage on these channels:
@Jeff Roberts
@Brad Sloan
Video, photos, illustrations, and commentary on this video is by me, Joe Tegtmeyer unless otherwise annotated.

Music in this video is obtained from the YouTube free and unrestricted and royalty-free use library. Ending song is Mr. Sunny Face - Wayne Jones

Drones used are DJI Mavic Mini, Mini 2 and Mavic Air 2.

Drone flight over Giga Texas is with permission of Tesla and CEO Elon Musk

Видео W & S Expansion! Megapack Site Growing & Entrance Changes! 8 May 2023 Giga Texas Updates (08:15AM) канала Joe Tegtmeyer
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
9 мая 2023 г. 2:19:23
00:29:19
Другие видео канала
Tesla Gigafactory Texas 4 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Tesla Gigafactory Texas 4 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Inside Views GA & Stamping 2! S Pier Drilling Crane arrives! 31 Mar 2023 Giga Texas Update (07:15AM)Inside Views GA & Stamping 2! S Pier Drilling Crane arrives! 31 Mar 2023 Giga Texas Update (07:15AM)Tesla Gigafactory Texas 16 December 2020 Cyber Truck & Model Y Factory Construction Update (08:45AM)Tesla Gigafactory Texas 16 December 2020 Cyber Truck & Model Y Factory Construction Update (08:45AM)Tesla Gigafactory Texas 27 January 2021 Cyber Truck & Model Y Factory Construction Update (08:15AM)Tesla Gigafactory Texas 27 January 2021 Cyber Truck & Model Y Factory Construction Update (08:15AM)Tesla Gigafactory Texas 25 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Tesla Gigafactory Texas 25 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Tesla Gigafactory Texas 15 May 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 15 May 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 26 February 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 26 February 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Storms & 9K Giga Press Assembly Accelerates! 18 January 2023 Giga Texas Construction Update(08:35AM)Storms & 9K Giga Press Assembly Accelerates! 18 January 2023 Giga Texas Construction Update(08:35AM)Starship visits Giga Texas & Two-Week Catchup Flight! 24 April 2023 Giga Texas Updates (07:35AM)Starship visits Giga Texas & Two-Week Catchup Flight! 24 April 2023 Giga Texas Updates (07:35AM)More Robots Arrive & Battery Pack Recycling. 9 January 2023 Giga Texas Construction Update (07:55AM)More Robots Arrive & Battery Pack Recycling. 9 January 2023 Giga Texas Construction Update (07:55AM)West Expansion, South Dual Pier Drills, East Construction! 3 April 2023 Giga Texas Updates (07:35AM)West Expansion, South Dual Pier Drills, East Construction! 3 April 2023 Giga Texas Updates (07:35AM)23 September 2022 … Detailed views inside Casting & 4680 production areas at Giga Texas! (06:45AM)23 September 2022 … Detailed views inside Casting & 4680 production areas at Giga Texas! (06:45AM)Tesla Gigafactory Texas 27 December 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)Tesla Gigafactory Texas 27 December 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)River Road Extension, Megapack Site & Switchyard Progress! 31 May 2023 Giga Texas Update (07:00AM)River Road Extension, Megapack Site & Switchyard Progress! 31 May 2023 Giga Texas Update (07:00AM)Tesla Gigafactory Texas 1 August 2022 Cyber Truck & Model Y Factory Construction Update (07:25AM)Tesla Gigafactory Texas 1 August 2022 Cyber Truck & Model Y Factory Construction Update (07:25AM)RE-UPLOAD Tesla Giga Texas 27 Oct 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)RE-UPLOAD Tesla Giga Texas 27 Oct 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)Tesla Gigafactory Texas 6 February 2021 Cyber Truck & Model Y Factory Construction Update (07:45AM)Tesla Gigafactory Texas 6 February 2021 Cyber Truck & Model Y Factory Construction Update (07:45AM)Casting Slab Demo, Bull Horned  Model Y & 2 Crates Unboxed.  24 May 2023 Giga Texas Update (09:35AM)Casting Slab Demo, Bull Horned Model Y & 2 Crates Unboxed. 24 May 2023 Giga Texas Update (09:35AM)Walls Gone, W Enter Cladding & Megapack Transformer Install! 26 June 2023 Giga Texas Update(07:45AM)Walls Gone, W Enter Cladding & Megapack Transformer Install! 26 June 2023 Giga Texas Update(07:45AM)Solar Canopies, Die Shop Bridge Crane & More Painting! 15 February 2023 Giga Texas Updates (09:35AM)Solar Canopies, Die Shop Bridge Crane & More Painting! 15 February 2023 Giga Texas Updates (09:35AM)
Яндекс.Метрика