Загрузка страницы

Tesla Gigafactory Texas 15 September 2020 Construction Update

15 September Giga Texas Update video. Major news is that yesterday, on the AustinTexas.gov official permit site, a public release of the official Gigafactory Texas Site Plan documents which gives a lot of new information about what is being built, where and how everything will be arranged. Link to all of the documentation is provided below.
There is a new clearing area just south of the on-site Martin Marietta concrete Batch plant and it revealed an old house that is likely going to be demolished. The clearing south of this is now known to be part of the switch yard and a temporary switch yard and work continues at a fast pace here. We also now know why they have been excavating south of where all of the trucks and vehicles were being parked and this is one of two water retention ponds needed to control water runoff due to rains that are common around Austin. Additional clearing and fill dirt application is occurring south of this area as well, all on the east side of the power lines.
In the west construction site, we now know that a very large water retention pond is being installed at the far south and west of the two foundations. We also now know for certain that there are two buildings being constructed. Work continues in the area that is suspected to be where the casting machines will go as large trenches and open excavation areas are very apparent. There are also two new square pits in the smaller of the two foundations near the south west.
They continue to try aerating the central mud pond area which is now able to have new fill applied and compacted. In fact, water trucks are once again applying water to help with the compaction. The northwest pond area fill is being aerated to allow trucks and bulldozers to enter the area and resume pond draining and fill in order to extend northward the second foundation as there is still a large disparity in ground level.

Thank you for watching and I hope this has been informative, educational and entertaining for you. If you would like, please consider supporting me via Patreon (link is in the description of this video and in the video itself) so I can continue to make and share these incredible videos.

Timestamps:
Site Plan document review: 0:16 to 2:59
Drone flight footage: 3:05 - end

Sources used in this video include:
Austin.gov public site for Giga Texas Site Plans:
https://abc.austintexas.gov/web/permit/public-search-other?t_detail=1&t_selected_folderrsn=12520107

Follow me on
Patreon https://www.patreon.com/joeslastchancegarage
Twitter @JoeTegtmeyer
Instagram (Joe’s Last Chance Garage) for the latest updates: #joeslastchancegarage
Facebook Joe Tegtmeyer and Joe’s Last Chance Garage

Use my Tesla Referral code https://www.tesla.com/referral/joe66892
#Tesla Giga Texas
#Giga Texas
#Gigafactory5
#Gigafactory Texas
#Terafactory Texas

Video, photos, illustrations and commentary on this video is by myself, Joe Tegtmeyer unless otherwise annotated.

Music in this video is obtained from the YouTube free and unrestricted and royalty-free use library

Видео Tesla Gigafactory Texas 15 September 2020 Construction Update канала Joe Tegtmeyer
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
16 сентября 2020 г. 2:11:14
00:23:21
Другие видео канала
Interview with Polaris Dawn Commander Jared IsaccmanInterview with Polaris Dawn Commander Jared IsaccmanTesla Gigafactory Texas 4 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Tesla Gigafactory Texas 4 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Inside Views GA & Stamping 2! S Pier Drilling Crane arrives! 31 Mar 2023 Giga Texas Update (07:15AM)Inside Views GA & Stamping 2! S Pier Drilling Crane arrives! 31 Mar 2023 Giga Texas Update (07:15AM)Creating a Lunar Economy ... A Detailed Discussion with Astroport Space CEO Sam XimenesCreating a Lunar Economy ... A Detailed Discussion with Astroport Space CEO Sam XimenesTesla Gigafactory Texas 25 May 2022 Cyber Truck & Model Y Factory Construction Update (07:15AM)Tesla Gigafactory Texas 25 May 2022 Cyber Truck & Model Y Factory Construction Update (07:15AM)Tesla Gigafactory Texas 17 January 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)Tesla Gigafactory Texas 17 January 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)Tesla Gigafactory Texas 16 December 2020 Cyber Truck & Model Y Factory Construction Update (08:45AM)Tesla Gigafactory Texas 16 December 2020 Cyber Truck & Model Y Factory Construction Update (08:45AM)Tesla Gigafactory Texas 27 January 2021 Cyber Truck & Model Y Factory Construction Update (08:15AM)Tesla Gigafactory Texas 27 January 2021 Cyber Truck & Model Y Factory Construction Update (08:15AM)Tesla Gigafactory Texas 25 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)Tesla Gigafactory Texas 25 November 2020 Cyber Truck & Model Y Factory Construction Update (09:30AM)W & S Expansion! Megapack Site Growing & Entrance Changes! 8 May 2023 Giga Texas Updates (08:15AM)W & S Expansion! Megapack Site Growing & Entrance Changes! 8 May 2023 Giga Texas Updates (08:15AM)Tesla Gigafactory Texas 3 October 2020 Construction Update (at 09:30AM)Tesla Gigafactory Texas 3 October 2020 Construction Update (at 09:30AM)Tesla Gigafactory Texas 15 May 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 15 May 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 26 February 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 26 February 2021 Cyber Truck & Model Y Factory Construction Update (07:30AM)Tesla Gigafactory Texas 24 November 2021 Cyber Truck & Model Y Factory Construction Update (08:00AM)Tesla Gigafactory Texas 24 November 2021 Cyber Truck & Model Y Factory Construction Update (08:00AM)Storms & 9K Giga Press Assembly Accelerates! 18 January 2023 Giga Texas Construction Update(08:35AM)Storms & 9K Giga Press Assembly Accelerates! 18 January 2023 Giga Texas Construction Update(08:35AM)Tesla Gigafactory Texas 21 January 2021 Cyber Truck & Model Y Factory Construction Update (08:00AM)Tesla Gigafactory Texas 21 January 2021 Cyber Truck & Model Y Factory Construction Update (08:00AM)Starship visits Giga Texas & Two-Week Catchup Flight! 24 April 2023 Giga Texas Updates (07:35AM)Starship visits Giga Texas & Two-Week Catchup Flight! 24 April 2023 Giga Texas Updates (07:35AM)More Robots Arrive & Battery Pack Recycling. 9 January 2023 Giga Texas Construction Update (07:55AM)More Robots Arrive & Battery Pack Recycling. 9 January 2023 Giga Texas Construction Update (07:55AM)West Expansion, South Dual Pier Drills, East Construction! 3 April 2023 Giga Texas Updates (07:35AM)West Expansion, South Dual Pier Drills, East Construction! 3 April 2023 Giga Texas Updates (07:35AM)Tesla Gigafactory Texas 27 December 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)Tesla Gigafactory Texas 27 December 2021 Cyber Truck & Model Y Factory Construction Update (08:30AM)23 September 2022 … Detailed views inside Casting & 4680 production areas at Giga Texas! (06:45AM)23 September 2022 … Detailed views inside Casting & 4680 production areas at Giga Texas! (06:45AM)
Яндекс.Метрика