Tesla Terafactory Texas Update #135 in 4K: Paint Shop & Casting Area Walls - 04/06/21 (5:00pm | 81°)

Hey everyone, it’s Randy! Today’s footage shows another busy and windy day, but most importantly, we see that work installing wall panels or sheathing in place on both the paint shop and casting areas has begun.

Here are today’s key takeaways:
- On the north end of the paint shop, wall sheathing installation has started and all of the green and white stacks of materials are of the USG Securock Glass-Mat Sheathing family of products. I’ll leave a link in the description with more info on it.
- A little further east in this northeast corner, the GigaPress area is now having wall panels installed on the far east side of the building.
- The south end shows the progress of the storm water system on the east side, which has now made it into the southern portion of the BIW area. Up on the roof we see that most of the roof concrete is covered except along the eastern and angled edges of the roof. The sloped roof transition framing has just about reached the western edge.
- The west side, rumored to be the general assembly area, is now expanding to the south.
- The northern end of the BIW area is having concrete finished on the second level and the ground level has rebar in place along this entire long section where we saw the line being built over the past month or so. We’ll most likely see concrete being poured here in the next day or two.
- The south end of the paint shop shows more metal wall studs being placed on the south facing wall and the wall of metal studs we saw yesterday between the paint shop and the GA building has tripled in length as you can see at the far left of the image as it works its way back into the building.
- The northwest corner is still awaiting the green light for crews to start assembling the structural steel that is growing in quantity with each passing day.
- The electrical substation now has even more lines that have been added compared to what we saw yesterday.
- Lastly, I take a look at the active clearing that is east of the large parking lot area for the workers. More clearing equipment is still being delivered to the site so it’s looking like this area is now a priority and is on the clock.

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended:

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 04-06-21
Time of Day: Late Afternoon - 5:00pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Simpler Times - The 126ers
Deep State - Vans in Japan
--------------------------------------------

Additional Info

USG Sheathing - https://www.usg.com/content/usgcom/en/products/walls/sheathing.html

Видео Tesla Terafactory Texas Update #135 in 4K: Paint Shop & Casting Area Walls - 04/06/21 (5:00pm | 81°) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
7 апреля 2021 г. 16:19:27
00:19:49
Другие видео канала
Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Tesla Terafactory Texas Update #99 in 4K:  Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #99 in 4K: Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)Terafactory Texas Update #30 - 9/29/20  ( Late Afternoon) - Major Work In The SouthTerafactory Texas Update #30 - 9/29/20 ( Late Afternoon) - Major Work In The SouthTesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #109 in 4K:  Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #109 in 4K: Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)
Яндекс.Метрика