Загрузка страницы

Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)

Hey everyone, Randy here! Today’s video shows mainly work being done leveling in the remaining areas that need it, as well as preparations for GeoPier work to take place in different areas of the site that we haven’t seen yet.

The key takeaways from today’s footage are that there weren’t as many vehicles out that we’ve been used to seeing recently around this time of day. In the south, the smaller dig area is having GeoPier work done and the larger dig has been smoothed out and all equipment moved out of it. Piles of aggregate are being delivered and built up in preparation of the previously mentioned GeoPier work to be done in other areas. Both of the retention ponds have nice and smooth finishes and look to be ready for the next phase of work to begin on them. There’s some pretty significant work that looks to be drilling of some sort at the batch plant. The rest of the site looks to have leveling work being done.

It was another great day for crews to work and to capture footage, with the rest of the forecast for the week being clear and sunny skies with temperatures in the high 80s and low 90s!

Before I go, please consider supporting the channel on Patreon via the link in the description or at the end of the video. If you’re new here, please be sure to hit the like, subscribe, and notification buttons if you want to be kept up-to-date with the latest content.

NOTE: The nearest lanes of highway traffic are traveling North, so keep that in mind if you are curious as to which direction is which when watching the video(s).

--------------------------------------------
Support Me On Patreon

https://www.patreon.com/terafactorytexas

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 10-05-20
Time of Day: Late Afternoon - 5:45pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts
@JoeTegtmeyer
@TxTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/channel/UCvRe…

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Violet Spirit - Dan Henig

Видео Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
6 октября 2020 г. 11:14:26
00:19:05
Другие видео канала
Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Tesla Terafactory Texas Update #99 in 4K:  Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #99 in 4K: Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)Terafactory Texas Update #30 - 9/29/20  ( Late Afternoon) - Major Work In The SouthTerafactory Texas Update #30 - 9/29/20 ( Late Afternoon) - Major Work In The SouthTesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #109 in 4K:  Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #109 in 4K: Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)
Яндекс.Метрика