Загрузка страницы

Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)

Hey guys, Randy here! In today’s video, we can see some significant increases in the speed in which the large structures are going up in both the north and south ends. I arrived about 20-30 minutes later than usual and cranes were still working on both ends of the site. There was still a good presence of crews scattered about the site that you could tell were going to be there well after sunset. With mostly GeoPier work taking place over the weekend after the holiday, it’s quite the uptick to see where we are by Monday evening with the changes shown today!

Here are today’s key takeaways:
- On the north end, we see that another section has been added to both the lower and upper levels of the steel structure. Steel decking now covers 4 sections of the lower level, 2 full sections of trusses are now in place atop the upper levels, and there is steel decking even atop this upper section that is placed for spreading out soon.
- On the west side, besides GeoPier work, crews are digging out a large trench that is along the edge of the factory foundation outline. Could this be the start of work on some defined foundation edges that could be poured soon? Could it be for utilities? Let me know what you guys think in the comments.
- The south end shows a flurry of activity as we can see that more of the footings for the large columns are currently getting formwork either added or removed, depending on if they have gotten concrete poured or not. The star of the show is the installation of another side beam running north to south on the west side of the column structure and 2 more of the large cross beams that now complete what is currently the first full width section of the large concrete columns running from east to west. There will be many more of these installed above this section, so it’s exciting to see both of these installed in one day!

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video. Let’s get to it, starting in about 10 seconds.

NOTE: The nearest lanes of highway traffic are traveling North, so keep that in mind if you are curious as to which direction is which when watching the video(s).

--------------------------------------------
Support Me On Patreon

https://www.patreon.com/terafactorytexas

--------------------------------------------

Tesla Referral Code

https://ts.la/randy93104

--------------------------------------------

Date Filmed: 11-30-20
Time of Day: Late Afternoon - 5:15pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/channel/UC4UwT7zCc-T_BN9_E45FVNA
@TxTerafactory - https://www.youtube.com/channel/UCDX-oB1LsCDJqeUNV1i65Sg

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/channel/UCvRe…

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Stardrive - Jeremy Blake
Simpler Times - The 126ers

Видео Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
1 декабря 2020 г. 12:52:38
00:18:47
Другие видео канала
Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Tesla Terafactory Texas Update #99 in 4K:  Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #99 in 4K: Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Terafactory Texas Update #30 - 9/29/20  ( Late Afternoon) - Major Work In The SouthTerafactory Texas Update #30 - 9/29/20 ( Late Afternoon) - Major Work In The SouthTesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #109 in 4K:  Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #109 in 4K: Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)
Яндекс.Метрика