Загрузка страницы

Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F)

Hey everyone, it’s Randy! Today’s video shows yet another major milestone, this time it’s the paved road coming from FM973 on the west side actually reaching the SH130 bridge, so we now officially have paved roads that join both sides of the massive Tesla property in this corner. We’ll see a few more details related to this in a bit when we see the video footage and like always, there are lots of other great updates to see.

Here are today’s key takeaways:
-The north end shows the space frame structure being assembled still underway as it grows in size.
-The BIW east-facing stairwell on the southern end shows the installation has made it to the top floor and it looks like just the roof access remains.
-The southern gap shows the progress of the big dig area as it looks to have about 60% of the outlined area excavated. Just south of here, we can see one of the large cranes being disassembled as well as another one on the other side of the SW corner.
-Speaking of the southwest corner, the structural steel installation is completed as we mentioned yesterday and we can actually see the last remaining beam on the ground north of the blue trailers, so it’s looking like they were just waiting until Friday for the topping out ceremony.
-A quick look over at the bridge area shows the road coming east from FM 973 has reached the bridge and we can see the first paved section of the westbound road beneath the bridge as well. There’s also a large trench to run electrical conduit beneath the road east of this as we head back towards the factory along the road and we can next see framing and rebar already in place for a large section of road that will be poured concrete just west of the detention pond.
-The GA west side shows workers removing the test window panes that have been set up for months now and more importantly, wall panel installation has resumed on the GA section heading south!
-The work to address the water issue next to the BCP building shows some type of cistern being put into place and we can see a cap for it in the frame as well while they continue to address the issue. The wall panel progress on the angled corner is well past the 50% mark and we can see new trenches for conduit and fiber lines across the berm area and the far left part of the frame north of the building running from east to west.
-The northern gap shows the continued progress of the structural steel assembly and they look to be speeding up on this end compared to the previous pace.

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended:

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 08-12-21
Time of Day: Late Afternoon - 5:30pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Early Avril - Unicorn Heads

Видео Tesla Terafactory Texas Update #197 in 4K: Joining The SW East & West Sides 08/12/21 (5:30pm | 97°F) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
13 августа 2021 г. 18:23:59
00:24:52
Другие видео канала
Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)Tesla Terafactory Texas Update #33 in 4K - 10/05/20 (Late Afternoon - 5:45pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #92 in 4K: Upon Further Review - 01/13/21 (5:00pm)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #190 in 4K: Paving Resumes - 07/28/21 (5:00pm | 98°F)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Tesla Terafactory Texas Update #77 in 4K: Raising More Everything- 12/17/20 (5:00pm)Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Terafactory Texas Update #21 - 9/10/20 - Wet And Windy!!!Tesla Terafactory Texas Update #99 in 4K:  Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #99 in 4K: Late Evening Flyover - 01/26/21 (6:15pm)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)Tesla Terafactory Texas Update #65 in 4K: Structure Build Speed Increasing - 11/30/20 (5:15pm)Terafactory Texas Update #30 - 9/29/20  ( Late Afternoon) - Major Work In The SouthTerafactory Texas Update #30 - 9/29/20 ( Late Afternoon) - Major Work In The SouthTesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #189 in 4K: Shaping Perimeter Roads & Lots - 07/27/21 (4:30pm | 98°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #137: Amazing Battery Structure Progress - 04/12/21 (5:00pm | 89°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #176 in 4K: Filling in the Gaps - 06/29/21 (5:30pm | 76°F)Tesla Terafactory Texas Update #109 in 4K:  Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #109 in 4K: Back To Work - 02/22/21 (5:15pm | 73°F)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #81 in 4K: Starting On The Docks - 12/28/20 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #93 in 4K: Casting & Stamping Foundation Progress - 01/14/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)Tesla Terafactory Texas Update #91 in 4K: Cranes Doing Crane Things - 01/12/21 (5:00pm)
Яндекс.Метрика