Welcome back guys, it’s Randy! Today’s video shows the continued progress on the areas covered in yesterday’s video. The next several stacks of windows have arrived for installation on the east side and major progress with road paving on the west side are a couple of things that really stand out. Let’s not forget all of the things happening in between as well.

Here are today’s key takeaways:
-Many of you have been wondering what the exact height of the building is, so at the start of the video I roughly eyeballed lining up with the top of the Double Tees in the northeast corner and noted the height of the drone, which was at 13 meters or almost 43 feet high. As for the progress of the roof in this area, we can see that all of the Double Tees have now been installed.
-Seven stacks of windows have been delivered to the southernmost point where the windows stop on the east-facing side of the BIW building and installation will most likely resume on Thursday.
-The southwest corner shows the daily look at the progress of the structural steel.
-On the west side of the GA building, we see more trenches in the area south of the concrete slab that was poured for the loading docks and these are also being used to run conduit that line up directly with what we see exposed on the paved asphalt section at the very top of the image, which we’ll get to in a moment. Here’s a closer look at the initial conduit that has roughly been laid for the time being. Further north at the concrete slab, we can see that expansion joints have been cut to help prevent cracking. As we continue north, we now see that the paved asphalt has been marked and lined for parking spaces and the conduit that has been run previously is directly on the north-to-south line shared between adjacent spaces as well as at all of the current and future spaces closest to the building. We can even see at the bottom of the image that more spaces are likely to be added once the paving is completed, which then begs the question, “Is this actually some sort of charging lot?” because that seems like an awful lot of conduit for just lighting. There are additional marked spaces north of this that do not have the conduit present, which further fuels my suspicion that what we just saw is the start of a large charging lot of some sort and I suspect they might be planning to pave this entire area that was widened to accommodate the marked spaces further south so that through traffic can pass them.
-The northwest corner again shows paving actively taking place next to the BCP building and it looks like we can see the first efforts of work being done to prep the path of the road that will run along the angled corner as well.
-The southern gap shows a quick update on the structural steel being used to fill in this section and at the northern gap, we can see they have started erecting steel on the footings that run down the middle of the gap, starting at the end nearest the Retox System.

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended:

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 07-21-21
Time of Day: Late Afternoon - 5:00pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Early Avril - Unicorn Heads

Видео Tesla Terafactory Texas Update #186 in 4K: Loading Docks or Charging Lot - 07/21/21 (5:00pm | 91°F) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
22 июля 2021 г. 18:05:49
00:25:41
Другие видео канала
Tesla Terafactory Texas Update #148 in 4K: Bobcat Project New Foundation - 05/04/21 (5:00pm | 81°F)Tesla Terafactory Texas Update #148 in 4K: Bobcat Project New Foundation - 05/04/21 (5:00pm | 81°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #168 in 4K: Some New Arrivals - 06/14/21 (5:00pm | 99°F)Tesla Terafactory Texas Update #168 in 4K: Some New Arrivals - 06/14/21 (5:00pm | 99°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #191 in 4K: Cybertruck Bodies Or Just Parts? 07/29/21 (5:00pm | 90°F)Tesla Terafactory Texas Update #191 in 4K: Cybertruck Bodies Or Just Parts? 07/29/21 (5:00pm | 90°F)Tesla Terafactory Texas Update #182 in 4K: New Steel Going Up - 07/12/21 (5:15pm | 85°F)Tesla Terafactory Texas Update #182 in 4K: New Steel Going Up - 07/12/21 (5:15pm | 85°F)Tesla Terafactory Texas Update #170 in 4K: Adding The Double Tees - 06/16/21 (5:00pm | 96°F)Tesla Terafactory Texas Update #170 in 4K: Adding The Double Tees - 06/16/21 (5:00pm | 96°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #145 in 4K: Two For One - 04/28/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #220 in 4K: New Tesla Headquarters 10/07/21 (4:15pm | 92°F)Tesla Terafactory Texas Update #220 in 4K: New Tesla Headquarters 10/07/21 (4:15pm | 92°F)Tesla Terafactory TX Update #133 in 4K: Stamping Roof Transition Underway - 04/01/21 (5:00pm | 72°F)Tesla Terafactory TX Update #133 in 4K: Stamping Roof Transition Underway - 04/01/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #180 in 4K: Superchargers Are Now Live - 07/08/21 (5:00pm | 84°F)Tesla Terafactory Texas Update #180 in 4K: Superchargers Are Now Live - 07/08/21 (5:00pm | 84°F)Tesla Terafactory Texas Update #143 in 4K: Battery Structure Concrete - 04/22/21 (5:00pm | 68°F)Tesla Terafactory Texas Update #143 in 4K: Battery Structure Concrete - 04/22/21 (5:00pm | 68°F)Tesla Terafactory Texas Update #113 in 4K: Nope - 02/26/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #113 in 4K: Nope - 02/26/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #184 in 4K: Working Through The Rain - 07/14/21 (5:15pm | 79°F)Tesla Terafactory Texas Update #184 in 4K: Working Through The Rain - 07/14/21 (5:15pm | 79°F)Tesla Gigafactory Texas 9 April 2021 Cyber Truck & Model Y Factory Construction Update (07:50AM)Tesla Gigafactory Texas 9 April 2021 Cyber Truck & Model Y Factory Construction Update (07:50AM)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)
Яндекс.Метрика