Загрузка страницы

Tesla Gigafactory Texas 9 April 2021 Cyber Truck & Model Y Factory Construction Update (07:50AM)

Gigafactory Texas on 9 April 2021! This is where the Cyber Truck and Model Y will be built!
What a busy and remarkably interesting day at Giga Texas this morning! When I arrived, I was amazed to see so much of the steel work in the northwest corner already up and all the cranes were busy lifting more by the minute. In just the hour and a half I was there, the structure grew very noticeably!
In this video, I provide a few news and other updates for Giga Texas, somewhat consolidating the most recent information I've heard into one spot. I also did a 30-day comparison of various locations around the site to show how much has changed in a short period of time. I hope you find this information helpful!

Timestamps:
News, updates, 30-day progress comparisons & Illustrations: 0:28 to 4:09
Drone flight footage & infographics: 4:16 to 26:23

Here are more highlights from an exceptionally busy morning!
- A few dozen (perhaps more) trucks were lined up around the site waiting to unload a lot of deliveries, including steel parts, construction equipment, factory parts and equipment, and a lot of various types of materials.
- The battery cell area had all the cranes working at the same time and four large sections of the structure were already erected from the ground to the roof level nearest the wests steel structure. Also, more materials were being stacked and prepositioned in the area, now covering about half the distance from the west structure to the north. The northeast part of the perimeter grade beam was being completed and concrete applied.
- The roof of the paint shop and he north part of the body-in-white structure were getting the final insulation and waterproof membranes installed and the transition between the paint shop steel and casting machine concrete roof was being constructed.
- The east wall of the paint shop was about 75% completed covered with green wall material and the east side of the casting machine structure had about 45% of the concrete wall panels installed at the time of filming.
- GeoPier work was actively progressing in the northeast corner of the foundation, just north of the current casting machine structure.
- Water management corrugated pipes were being installed in ling sections just on the east of the structure and it appears that smaller diameter pipes are now being manufactured as seen at the mobile pipe mill.
- More land clearing on the far east side where the cathode and lithium hydroxide processing facility will be constructed. The ponds are nearly completely removed, and the area continues to become more level across the entire area.
- It appears that they may be preparing to make a diversion road to allow portions of Harold Green road to be lowered. There were excavations going on close to the pavement on both sides and what appears to possibly be a temporary road being made just north of the existing Harold Green road.
- The stamping machine roof appears to be at a holding point until the water management system and piping is installed on the east lower area of the roof ... capped drain holes were visible along this entire length
- More footings are being excavated and completed in the southwest footing field area. The general direction of all this work is to the south. They are now about two or three footings from where the south perimeter grade beam would be so much of the temporary storage, containers and workshops may need to be moved soon to allow work to progress.
Thank you for watching and I hope this has been informative, educational and entertaining for you. If you would like, please consider supporting me via Patreon (link is in the description of this video and in the video itself) so I can continue to make and share these incredible videos.

Sources used in this video:
https://www.statesman.com/story/business/2021/03/31/elon-musk-says-teslas-austin-site-hire-ten-thousand-2022/4826859001/
https://www.builtinaustin.com/2021/03/30/tesla-hiring-austin-gigafactory

Follow me on
Patreon https://www.patreon.com/joeslastchancegarage
Twitter @JoeTegtmeyer
Instagram (Joe’s Last Chance Garage) for the latest updates: #joeslastchancegarage
Facebook Joe Tegtmeyer and Joe’s Last Chance Garage

Use my Tesla Referral code https://www.tesla.com/referral/joe66892

Be sure to check out additional Texas Gigafactory footage on these channels:
@Jeff Roberts
@Terafactory Texas
@Texas Terafactory

Video, photos, illustrations and commentary on this video is by me, Joe Tegtmeyer unless otherwise annotated.

Music in this video is obtained from the YouTube free and unrestricted and royalty-free use library. Ending song is Mr. Sunny Face - Wayne Jones

Drones used are DJI Mavic Mini and Mavic Air 2.

Drone flight over Giga Texas is with permission of Tesla and CEO Elon Musk

Видео Tesla Gigafactory Texas 9 April 2021 Cyber Truck & Model Y Factory Construction Update (07:50AM) канала Joe Tegtmeyer
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
10 апреля 2021 г. 2:08:07
00:26:24
Другие видео канала
Main Entrance Lit Up, Huge Glass Panels on South Extension! 29 Nov 2023 Giga Texas Update (07:35AM)Main Entrance Lit Up, Huge Glass Panels on South Extension! 29 Nov 2023 Giga Texas Update (07:35AM)21 Cybertrucks at Giga Texas SHORT video 1080P21 Cybertrucks at Giga Texas SHORT video 1080P21 Cybertrucks! S extension work progress & E garage grows! 27 Nov 2023 Giga Texas Update (08:35AM)21 Cybertrucks! S extension work progress & E garage grows! 27 Nov 2023 Giga Texas Update (08:35AM)SpaceX & Boring Company Facility Review & Discussion! 25 Nov 2023 Development Site Update (10:00 AM)SpaceX & Boring Company Facility Review & Discussion! 25 Nov 2023 Development Site Update (10:00 AM)Muddy Cybertruck, Park Garage Goes Vertical & Many Castings! 24 Nov 2023 Giga Texas Update (08:35AM)Muddy Cybertruck, Park Garage Goes Vertical & Many Castings! 24 Nov 2023 Giga Texas Update (08:35AM)21 November 2023 Post-Starship Second Launch Production Site Tour,  Discussion & New Developments.21 November 2023 Post-Starship Second Launch Production Site Tour, Discussion & New Developments.SpaceX Starship De-stacking Time-lapse from 16 November 2023 ahead of IFT-2SpaceX Starship De-stacking Time-lapse from 16 November 2023 ahead of IFT-2South Steel & Footings, 13 Cybertrucks & 100s of Castings! 13 Nov 2023 Giga Texas Update (07:55AM)South Steel & Footings, 13 Cybertrucks & 100s of Castings! 13 Nov 2023 Giga Texas Update (07:55AM)14 Cybertrucks, 6 Bodies & 1st Factory Extension Steel!10 November 2023 Giga Texas Update (07:35AM)14 Cybertrucks, 6 Bodies & 1st Factory Extension Steel!10 November 2023 Giga Texas Update (07:35AM)Cybertruck H2O Leak Tests, Big Manifold Assembly & S Footings! 8 Nov 2023 Giga Texas Update(07:35AM)Cybertruck H2O Leak Tests, Big Manifold Assembly & S Footings! 8 Nov 2023 Giga Texas Update(07:35AM)“Everest” Cybertruck Crates. Lit W Entrance, More S Footings. 3 Nov 2023 Giga Texas Update (07:55AM)“Everest” Cybertruck Crates. Lit W Entrance, More S Footings. 3 Nov 2023 Giga Texas Update (07:55AM)Cybertruck Crab Walk Testing? S Footing Expansion & More! 1 November 2023 Giga Texas Update(09:15AM)Cybertruck Crab Walk Testing? S Footing Expansion & More! 1 November 2023 Giga Texas Update(09:15AM)Cybertrucks Everywhere! S Footing & Expansion Progress! 25 October 2023 Giga Texas Update (08:35AM)Cybertrucks Everywhere! S Footing & Expansion Progress! 25 October 2023 Giga Texas Update (08:35AM)Cybertrucks Driving! S Extension Construction Progress! 20 October 2023 Giga Texas Update (08:35AM)Cybertrucks Driving! S Extension Construction Progress! 20 October 2023 Giga Texas Update (08:35AM)Nine New Cybertrucks! Temporary Switchyard Disassembly!16 October 2023 Giga Texas Update (07:55AM)Nine New Cybertrucks! Temporary Switchyard Disassembly!16 October 2023 Giga Texas Update (07:55AM)14 Oct 2023 Annular Eclipse from San Antonio, Texas14 Oct 2023 Annular Eclipse from San Antonio, TexasCybertruck Bonanza Day! Chiller Plant N2 Tanks moved!13 October 2023 Giga Texas Update (07:55AM)Cybertruck Bonanza Day! Chiller Plant N2 Tanks moved!13 October 2023 Giga Texas Update (07:55AM)Vehicle Production Resumes! Also, 1st Crash Test Conducted!  27 Sep 2023 Giga Texas Update (07:55AM)Vehicle Production Resumes! Also, 1st Crash Test Conducted! 27 Sep 2023 Giga Texas Update (07:55AM)Entrance Finished! 4 Cybertrucks, 3 for Crash Testing! 22 September 2023 Giga Texas Update (07:35AM)Entrance Finished! 4 Cybertrucks, 3 for Crash Testing! 22 September 2023 Giga Texas Update (07:35AM)Production Pause Continues & Cybertruck on Rotisserie! 20 September 2023 Giga Texas Updates(07:35AM)Production Pause Continues & Cybertruck on Rotisserie! 20 September 2023 Giga Texas Updates(07:35AM)Cybertruck (CT) Production Equipment & 5 CT's on Site! 18 September 2023 Giga Texas Update (07:55AM)Cybertruck (CT) Production Equipment & 5 CT's on Site! 18 September 2023 Giga Texas Update (07:55AM)
Яндекс.Метрика