Загрузка страницы

Project In-Site: | East Aviation | Ep. 2 | Calm Before the Storm Drain

East Aviation remains busy. Here we witness 3 intertwined stories. The three teams that occupy this site are working tirelessly and harmoniously. As a Dirt Team demolishes the Aztec intersection, a Utility Team installs giant 26,000lbs box culverts, while another Utility Team excavates and lays large concrete storm drain pipes. Check this episode of East Aviation's Project In-site and witness the reconstruction of thousands of feet of road, concrete, and drainage structures.

Music by: https://soundcloud.com/hip-hop-rep/hard-gangsta-rap-instrumental

Twitter: https://twitter.com/DDInc6?s=20
Facebook: https://www.facebook.com/DandDContrInc
Instagram: https://www.instagram.com/danddinc_/

Видео Project In-Site: | East Aviation | Ep. 2 | Calm Before the Storm Drain канала D&D Contractors, Inc.
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
18 мая 2020 г. 5:04:15
00:05:09
Яндекс.Метрика