Project In-Site: | Ep.2 | Pushing Forward |
Welcome back to another episode of Project In-Site. Previously we began the reconstruction of S. Santa Clara road in Marion, Texas. Despite a momentous start, we ran into trouble with Mother Nature as she ravaged our job site with heavy rains. On this episode we must push forward in order to complete the reconstruction on time and before the opening of Toyota's new transmission plant. Also, we visit Lily Springs as the a dirt and utility team unite in order to complete the sewer installation and backfill.
Twitter: https://twitter.com/DDInc6?s=20
Facebook: https://www.facebook.com/DandDContrInc
Instagram: https://www.instagram.com/danddinc_/
LinkedIn: https://www.linkedin.com/company/d-d-contractors-inc
Видео Project In-Site: | Ep.2 | Pushing Forward | канала D&D Contractors, Inc.
Twitter: https://twitter.com/DDInc6?s=20
Facebook: https://www.facebook.com/DandDContrInc
Instagram: https://www.instagram.com/danddinc_/
LinkedIn: https://www.linkedin.com/company/d-d-contractors-inc
Видео Project In-Site: | Ep.2 | Pushing Forward | канала D&D Contractors, Inc.
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Project In-Site: | Lily Springs | Ep. 3 | Diggin' DeepLannen Bridge ProjectBaird Road Project Phase 3: Milling and Repaving RAWBedrock Dragline ExtractionLevantina Quarries & Materials70m 145 tonne lorry meets small Surrey roundabout.How Asphalt Paving should be done by J.A. CooperSeptic System - Dry Well InstallationVW Amarok Tackling Gunshot Creek Sept 2015WULLSCHLEGER FlächenreinigungTime-lapse Construction Anthonys Cutting Realignment ProjectHow to Pour a Concrete DrivewayGarage Floor and Driveway Demo and ReplacementR-1 Aggregate Chip Spreader on roadStack | Cat® TrialsTechnology: The Incredible Journey of a Dredge through the JunglePool Construction TimelapseAbandoned Excavator left in woods for 16 years- Will it start ??Innovation In Roads (2011)Peikko Technology for Wind Turbine Foundations