Загрузка страницы

Project In-Site: | S1E5 | Curb & Crown at Cordova

Welcome back to another episode of Project In-Site. In this episode, now that we have finished preparing our first lift of base here at Cordova Crossing, we pour the curb and other concrete structures. Once the curb is poured we order more base material and finish our development of the road by adding in the crown. Once the crown is refined we are ready for asphalt.

Subscribe for Ep. 4 where we lay asphalt and finally turn this old cornfield into someones future neighborhood and much more as we continually construct South Texas.

Music by: https://soundcloud.com/thebeatzmap/kaveli-beats-nightshift-violin-dramatic-melodic-rap-beat-hip-hop-instrumental-2017

Twitter: https://twitter.com/DDInc6?s=20
Facebook: https://www.facebook.com/DandDContrInc
Instagram: https://www.instagram.com/danddinc_/

Видео Project In-Site: | S1E5 | Curb & Crown at Cordova канала D&D Contractors, Inc.
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
20 марта 2020 г. 14:55:43
00:03:48
Яндекс.Метрика