Загрузка страницы

Project In-Site: | Cordova Crossing | Ep. 1 | Lime Stabilizing Sub-Grade

Although this project is on its way to being finished we bring you episode one of the Cordova Crossing season. Here we take a glance at the first step to finalizing the streets as we prepare them for base, curb and asphalt. Lime stabilization is vital to the future of the road as it adds strength and structure and provides our materials with a solid foundation to build from. Stay tuned for episode 2 as we lay base and pour curbs.

Twitter: https://twitter.com/DDInc6?s=20
Facebook: https://www.facebook.com/DandDContrInc
Instagram: https://www.instagram.com/danddinc_/

Music by Shaibi
https://soundcloud.com/suhaib-javaid

Видео Project In-Site: | Cordova Crossing | Ep. 1 | Lime Stabilizing Sub-Grade канала D&D Contractors, Inc.
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
27 февраля 2020 г. 8:28:12
00:03:13
Яндекс.Метрика