Загрузка страницы

WIND TURBINE SHOWING NEARLY COMPLETED INTERNAL HOUSING

Here is a short clip of our progress. The outer panels of the turbine have been powder coated. The frame of the turbine housing and the front rotor have been hand painted with a tractor enamel with hardener. The chain drive has been connected and tested again. Final preparations are being made to wire up the motor. We will be running this system on 480 V 3 phase but it could be wired for practically any voltage. I prefer the higher voltage systems. 12 - 48 volt systems have limited real potential for substantial efficient generation of electricity and higher cost. This will be connected to a regenerative variable speed drive and directly grid tied.

Видео WIND TURBINE SHOWING NEARLY COMPLETED INTERNAL HOUSING канала DON SCHMIDTKE
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
29 апреля 2017 г. 22:10:24
00:00:23
Яндекс.Метрика