The Renovation: Episode 16 // Framing in the Office
Hello again everyone!!
We are back at it again and the foot is to the floor on the renovation of the new Lift Arc Studios shop and office location in downtown Roanoke, VA.
In this episode, Tay works with Greg Rhodes, the contractor, to lay out the walls for the new office build-out in the front corner of the building. Once that's done, he goes shopping at Black Dog Salvage, an architectural antiques and salvage company up the road, for some elements he hopes to include in the new space including some vintage, industrial, metal-framed windows, some salvaged doors, corrugated metal siding and more!
The next day, shortly after receiving a large delivery of lumber, the framing crew arrives to start framing in the office and bathroom. Shout out to Alex J Construction here in Roanoke, VA! Their crew knocked out the framing of the office in ONE DAY! Once the framing was up, Herb Stauffer (plumber) and Chris Thornton of All Service Electric set to work running the plumbing and electrical for the space.
It's getting real yall!!
Filmed and hosted by Tay Whiteside
Edited by Walker Hooper
Thanks for watching!
Be sure to follow Lift Arc Studios on social media to stay up to date on everything going on at the shop!
Facebook.com/liftarcstudios
Instagram: @liftarcstudios @taywhiteside
Email: Tay@liftarcstudios.com
www.liftarcstudios.com
Видео The Renovation: Episode 16 // Framing in the Office канала Lift Arc Studios
We are back at it again and the foot is to the floor on the renovation of the new Lift Arc Studios shop and office location in downtown Roanoke, VA.
In this episode, Tay works with Greg Rhodes, the contractor, to lay out the walls for the new office build-out in the front corner of the building. Once that's done, he goes shopping at Black Dog Salvage, an architectural antiques and salvage company up the road, for some elements he hopes to include in the new space including some vintage, industrial, metal-framed windows, some salvaged doors, corrugated metal siding and more!
The next day, shortly after receiving a large delivery of lumber, the framing crew arrives to start framing in the office and bathroom. Shout out to Alex J Construction here in Roanoke, VA! Their crew knocked out the framing of the office in ONE DAY! Once the framing was up, Herb Stauffer (plumber) and Chris Thornton of All Service Electric set to work running the plumbing and electrical for the space.
It's getting real yall!!
Filmed and hosted by Tay Whiteside
Edited by Walker Hooper
Thanks for watching!
Be sure to follow Lift Arc Studios on social media to stay up to date on everything going on at the shop!
Facebook.com/liftarcstudios
Instagram: @liftarcstudios @taywhiteside
Email: Tay@liftarcstudios.com
www.liftarcstudios.com
Видео The Renovation: Episode 16 // Framing in the Office канала Lift Arc Studios
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
The Renovation: Episode 9 // First Load of GravelThe Helix Takes Shape! - Helical Sculpture Pt. 3 // Lift Arc BuildsTay Roasts Your Comments LIVE!These Lights Used to Make Pizzas?Our Biggest & Fanciest Fire Pit YetINDESTRUCTABLE Vegetable Squeesher // Lift Arc BuildsWE HIT 2000 SUBSCRIBERS!!! // Special LIVE Stream AnnouncementTIG welding can be fun #welder #welding #tigweldingHow to Build Cubes from Steel Tubing // Lift Arc Builds: Bedside Table BasesBehind The Craft : Jed Curtis, Heart and Spade ForgeTIG Welded Artistic Metal Table Build Pt. 1 // Lift Arc BuildsThe Renovation: Episode 13 // Pressure Washing the CeilingTay and Aaron Build a Chair Pt. 1 // Lift Arc BuildsThe Renovation: Episode 12 // I'm Out of Storage SpaceHow Do You Make a Job Estimate?2,000 Subscriber Celebration!The Renovation: Episode 10 // A Trip to the QuarryThe Renovation: Episode 15 // THE CONCRETE SLABTay Needs Your Help!The Renovation: Episode 14 // Chipping up the RampLive Edge Walnut Coffee Table Build (for charity)!