Timber Framed Barn Part 6 Forms Off - Foundation Finished.
After two weeks or setting time it was time to remove the forms from the foundations. The concrete turned out great. I then took the corners off using a grinder and diamond cutter disk. I then had 20 tons of 40mm down stone delivered and levelled the floor ready for us to put stand on for the framing.
Видео Timber Framed Barn Part 6 Forms Off - Foundation Finished. канала Kris Harbour Natural Building
Видео Timber Framed Barn Part 6 Forms Off - Foundation Finished. канала Kris Harbour Natural Building
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Powering An Old Mill 1.5 Kw Lake District Overshot Waterwheel Project Part 4Powering An Old Mill - 1.5 Kw Lake District Overshot Waterwheel Project Part 2Timber Framed Barn Part 18 Main Roof PurlinsShearing our own sheepJobs Around The Farm And Barn Raising UpdateTimber Framed Barn Part 13 Timber Frame CompleteTimber Framed Barn Part 12 Milling Milling And More MillingTimber Framed Barn Part 11 Cross Frames And Oak PegsTimber Framed Barn Part 9 Wall Frames CompleteTimber Framed Barn Part 8 Framing Has Started!Timber Framed Barn Part 7 More Milling And Temporary WorkshopHand Carved 2m Wooden Wind Turbine BladesTimber Framed Barn Part 5 Post FoundationsTimber Framed Barn Part 4 Milling 20 Tons Of Logs In To 8x8'sRebuilding My 26 Year Old Vans Engine While I Wait Out The Bad WeatherTimber Framed Barn Part 3 Log Delivery And Starting The Foundation.Timber Framed Barn Part 2 DIY Post Mount BasesBig Timber Framed Barn Build Part 1 The DesignTraditional Mortise And Tenon Door For The Timber Framed GreenhouseOff Grid 2 KW Axial Flux Wind Turbine And MPPT Dump Load Controler Build