Timber Framed Barn Part 13 Timber Frame Complete
After a couple of weeks away from the barn while I finished milling we are back for 3 days to finish the last parts of the frame. It all went well until it came to moving the timber. I was let down by the lorry driver so I needed u trailering it all back in lots of trips. it was a bit of a hectic day but thanks to some good help we got it done. its now back at my lace covered over and ready for the next stage.
Видео Timber Framed Barn Part 13 Timber Frame Complete канала Kris Harbour Natural Building
Видео Timber Framed Barn Part 13 Timber Frame Complete канала Kris Harbour Natural Building
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Powering An Old Mill 1.5 Kw Lake District Overshot Waterwheel Project Part 4Powering An Old Mill - 1.5 Kw Lake District Overshot Waterwheel Project Part 2Timber Framed Barn Part 18 Main Roof PurlinsShearing our own sheepJobs Around The Farm And Barn Raising UpdateTimber Framed Barn Part 12 Milling Milling And More MillingTimber Framed Barn Part 11 Cross Frames And Oak PegsTimber Framed Barn Part 9 Wall Frames CompleteTimber Framed Barn Part 8 Framing Has Started!Timber Framed Barn Part 7 More Milling And Temporary WorkshopHand Carved 2m Wooden Wind Turbine BladesTimber Framed Barn Part 6 Forms Off - Foundation Finished.Timber Framed Barn Part 5 Post FoundationsTimber Framed Barn Part 4 Milling 20 Tons Of Logs In To 8x8'sRebuilding My 26 Year Old Vans Engine While I Wait Out The Bad WeatherTimber Framed Barn Part 3 Log Delivery And Starting The Foundation.Timber Framed Barn Part 2 DIY Post Mount BasesBig Timber Framed Barn Build Part 1 The DesignTraditional Mortise And Tenon Door For The Timber Framed GreenhouseOff Grid 2 KW Axial Flux Wind Turbine And MPPT Dump Load Controler Build