Finished Clearing The Site
Finished clearing all the trees and brush. Got most of the pile burned with just a few stumps left. Tried to smooth out the area and hopefully get it to dry quicker. Had about 30 hours in this job start to finish and sawing all the logs up and stacking them. It ended up being almost 3/4 of an acre cleared out. Now it should dry over the weekend and the builder can come back and lay out the basement and building. Thanks for watching! #EliteEarthworks #Takeuchi #landclearing
Видео Finished Clearing The Site канала Elite Earthworks LLC
Видео Finished Clearing The Site канала Elite Earthworks LLC
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Extending A 2" IPS Water MainGrading The Crawl Space With The Spectra Laser ReceiverRoughing in some yardsLaid Sod, Graded A Driveway Approach And Dug A FootingBackfilling A Retaining Wall And Rough GradingSpreading Rock With The 2150More Clay Going In, The Track Is Coming AlongFinishing Installing The Downspouts And Moving Dirt OnsiteThe Devin Dyer Show Podcast ClipBurying Downspouts And Cutting A Swale Between Two DuplexesCutting Out A Hillside To Extend A Gravel LotFinishing The Rock On The Building ApproachSpreading Topsoil Along A New Concrete DrivewaySpreading Rock Around The Catch BasinGrading Out The Ditch For The Catch BasinTailgating Rock On A Driveway To Fix Soft SpotsBrush Mowing A Lot With The Diamond MowerMore Shop Clean Up And Grading With The 2150Loading The Last Of The Trees And StumpsDigging Out Soft Material And Backfilling With ClayCutting Out The Clay On The Center Section Of The Lot