Extending A 2" IPS Water Main
Extending a 2" IPS water main. I have a 700' of ditch to dig for a water main to a new construction home. The water main stops short of the property for the new house so it has to be extended. This was a very rocky dig, took almost 4 days to dig it and 3 sets of teeth on the bucket. I also had to cross a driveway and the mole hog would not bore under it so I dug across it. I put a 3" sleeve in so I put clean rock back and open the driveway back up since I didn't have the pipe. Thanks for watching! #EliteEarthworks #Takeuchi #watermain
Видео Extending A 2" IPS Water Main канала Elite Earthworks LLC
Видео Extending A 2" IPS Water Main канала Elite Earthworks LLC
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Grading The Crawl Space With The Spectra Laser ReceiverPrairie Hills Is Almost Done!Laid Sod, Graded A Driveway Approach And Dug A FootingBackfilling A Retaining Wall And Rough GradingSpreading Rock With The 2150Digging The Crawl SpaceFinishing The Grading And Driveway At Diamond Grove AdventuresFinishing Installing The Downspouts And Moving Dirt OnsiteBurying Downspouts And Cutting A Swale Between Two DuplexesCutting Out A Hillside To Extend A Gravel LotFinishing The Rock On The Building ApproachSpreading Rock Around The Catch BasinGrading Out The Ditch For The Catch Basin630 Loads Of Clay Finished At The Track JobGrading The Circle DrivewayFinished Graded And Ready For SodRepairing A 10' Tall Chain Link FenceDigging Out Soft Material And Backfilling With ClayPaving The New Parking LotFixing Potholes In A Gravel Parking Lot