Cutting Out A Hillside To Extend A Gravel Lot
Cutting out a hillside to extend a gravel lot. This is the second job I have on this site. They are wanting to extend their gravel shop lot and to be able to do so I need to dig about 300-400 loads of dirt out of this hillside. I'm going to cut the back then rip rap the sides and spread base rock on the flat part. I'm separating the brush and trash from the dirt. I also discover some very nice clay that I plan to stockpile at my shop for future jobs. I hired the same guys that helped on the front lot and we were able to get 54 loads in a day. Thanks for watching! #EliteEarthworks #Takeuchi #excavation
Видео Cutting Out A Hillside To Extend A Gravel Lot канала Elite Earthworks LLC
Видео Cutting Out A Hillside To Extend A Gravel Lot канала Elite Earthworks LLC
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Extending A 2" IPS Water MainGrading The Crawl Space With The Spectra Laser ReceiverLaid Sod, Graded A Driveway Approach And Dug A FootingBackfilling A Retaining Wall And Rough GradingSpreading Rock With The 2150Digging The Crawl SpaceFinishing Installing The Downspouts And Moving Dirt OnsiteThe Devin Dyer Show Podcast ClipBurying Downspouts And Cutting A Swale Between Two DuplexesFinishing The Rock On The Building ApproachSpreading Topsoil Along A New Concrete DrivewaySpreading Rock Around The Catch BasinRoot Raking With The Skeleton Bucket On The TL12r2Grading Out The Ditch For The Catch Basin630 Loads Of Clay Finished At The Track JobFinished Graded And Ready For SodFinishing Some Yards With Mud!More Clearing On The House LotMore Shop Clean Up And Grading With The 2150Repairing A 10' Tall Chain Link Fence