How Long is it Going to Take to Build My House - How a House is Built
This is the Most Accurate Video on the Home Build Timeline. As a New Home Construction Specialist with over 15 years of experience, the #1 question is, How long is it going to take to build my house? I’m going in-depth to give you the most accurate description on the home build process with the most realistic timeline for how long it should take to build your house & show you, How a House is Built. If you're building a home or preparing to build a house, this may be THE MOST IMPORTANT VIDEO YOU WATCH.
The question I hear most is, “How long is it going to take to build my house?” I’m going to give you an extremely accurate timeline for the completion of a new construction home, AND I’ll go in-depth on the home build process as well.
Ty Wilde Utah Realtor aka Ty The Real Estate Guy
801-995-2337
TyWilde7@gmail.com
https://www.eaglemountain.com/
Wise Choice R.E.
Find me on Social Media:
Instagram: https://www.instagram.com/ty_the_real_estate_guy/
Twitter: https://twitter.com/Ty_Wilde
Facebook: https://www.facebook.com/TyTheRealEstateGuyUtah/
TikToc: https://vm.tiktok.com/ZMeBoRPK1/
Recommended Videos:
10 Questions You NEED to Ask Builders - https://youtu.be/nPgtVKruGWI
How to Find the BEST Home Builder - https://youtu.be/bZn5BIOcyrc
How to choose the Best Homesite - https://youtu.be/DFeEHEX8Zss
Why You Should Use the Builders Lender - https://youtu.be/CHKe0bI0AgY
How to SAVE MONEY when Building a Home - https://youtu.be/2wAmJACmkGc
How a House is Built - https://youtu.be/p9LlHOgfIeE
Final Walk-Through with Home Builders - https://youtu.be/4hzRcYekMrM
In Depth Guide for Buying a New Construction Home - https://youtu.be/Lni9URMXn6E
UTAH Videos:
UTAH What You NEED to Know - https://youtu.be/3COe35xgOLo
10 Reasons UTAH is GREAT - https://youtu.be/txMpNs37BBs
Reasons NOT to Move to UTAH - https://youtu.be/L8NAT7A1g6c
FUN & Exciting things to do in Utah - https://www.youtube.com/user/WildeKingdom?sub_confirmation=1
The process for building a home
#1 the excavator will mark the homesite so they know where to dig.
#2 Break ground, digging the hole for the house.
#3 Pour the concrete footings,
#4 Foundation walls are poured. Concrete needs about 10 days to cure before they start framing. But, there’s a lot the can be done while we wait.
#5 The sub-rough sewer & main waterlines are run from the street, under the foundation wall.
#6 Window wells are bolted around the basement windows
#7 Damp-proof tar is applied to the exterior foundation wall.
#8 Water & sewer lines are run to the locations where the kitchen, bathrooms & etc. will be.
#9 The excavators will backfill around the foundation wall & compact the soil.
#10 Basement & garage floors poured
#11 Gas line will be run from the street to the home.
#12 Framing begins.
#13 The main electrical box is installed
#14 Roofing
#15 The 4-way process begins. Plumbing, electrical & HVAC
#16 Inspection from the city to confirm the work has been done to code + 4-way meeting with buyers.
#17 Insulation is hung.
#18 Soffit, fascia, stucco, or siding & any brick or stone installation.
#19 The tub & shower surrounds installed.
#20 Sheet rock/drywall, is hung. Mud, tape & texture the walls.
#21 The finish workers install the baseboards, door casings & shelving for closets.
#22 Fireplace, exterior doors & windows installed.
#23 Paint
#24 Decks, concrete patios, walkways, the porch, steps to the porch. & the driveway.
#25 The large exterior garage doors installed.
#26 Vinyl &/or tile floors are laid.
#27 Cabinets are installed in kitchen & bathrooms
#28 Laminate &/or wood floors installed
#29 The electrician will come back to add fixtures & complete final tasks
#30 Final HVAC
#31 knobs or pulls for your cabinets are mounted
#32 Carpet is installed
#33 Countertops are placed in the kitchens & the bathrooms
#34 Bathroom mirrors & shower doors installed
#35 Finish plumbing will be completed including installation of plumbing fixtures
#36 Appliances installed. Builders usually include a dishwasher, microwave & stove with the purchase of the home
Now, all major items should be completed
#37 The superintendent aka the construction manager will do a quality walk making a punch list of items that still need to be completed. This usually includes blue tape to mark any locations that need paint touch up. The house will also get a quick cleaning
#38 The homeowner orientation aka the final walkthrough for the buyer. At this appointment, the builder’s representative will show you how to work your home & you’ll be able to point out any work that hasn’t been completed. Most builders require 5-7 days to complete these final items
#39 The home will receive a final cleaning
& most builders will schedule a final homeowner walk through to confirm the final touch ups & repairs have been completed
#40 You can now close on the Home. Usually, you’ll head to a title company to sign your closing documents. Once the home funds & records with the city, you’ll receive the keys to your home
Видео How Long is it Going to Take to Build My House - How a House is Built канала Ty the Real Estate Guy
The question I hear most is, “How long is it going to take to build my house?” I’m going to give you an extremely accurate timeline for the completion of a new construction home, AND I’ll go in-depth on the home build process as well.
Ty Wilde Utah Realtor aka Ty The Real Estate Guy
801-995-2337
TyWilde7@gmail.com
https://www.eaglemountain.com/
Wise Choice R.E.
Find me on Social Media:
Instagram: https://www.instagram.com/ty_the_real_estate_guy/
Twitter: https://twitter.com/Ty_Wilde
Facebook: https://www.facebook.com/TyTheRealEstateGuyUtah/
TikToc: https://vm.tiktok.com/ZMeBoRPK1/
Recommended Videos:
10 Questions You NEED to Ask Builders - https://youtu.be/nPgtVKruGWI
How to Find the BEST Home Builder - https://youtu.be/bZn5BIOcyrc
How to choose the Best Homesite - https://youtu.be/DFeEHEX8Zss
Why You Should Use the Builders Lender - https://youtu.be/CHKe0bI0AgY
How to SAVE MONEY when Building a Home - https://youtu.be/2wAmJACmkGc
How a House is Built - https://youtu.be/p9LlHOgfIeE
Final Walk-Through with Home Builders - https://youtu.be/4hzRcYekMrM
In Depth Guide for Buying a New Construction Home - https://youtu.be/Lni9URMXn6E
UTAH Videos:
UTAH What You NEED to Know - https://youtu.be/3COe35xgOLo
10 Reasons UTAH is GREAT - https://youtu.be/txMpNs37BBs
Reasons NOT to Move to UTAH - https://youtu.be/L8NAT7A1g6c
FUN & Exciting things to do in Utah - https://www.youtube.com/user/WildeKingdom?sub_confirmation=1
The process for building a home
#1 the excavator will mark the homesite so they know where to dig.
#2 Break ground, digging the hole for the house.
#3 Pour the concrete footings,
#4 Foundation walls are poured. Concrete needs about 10 days to cure before they start framing. But, there’s a lot the can be done while we wait.
#5 The sub-rough sewer & main waterlines are run from the street, under the foundation wall.
#6 Window wells are bolted around the basement windows
#7 Damp-proof tar is applied to the exterior foundation wall.
#8 Water & sewer lines are run to the locations where the kitchen, bathrooms & etc. will be.
#9 The excavators will backfill around the foundation wall & compact the soil.
#10 Basement & garage floors poured
#11 Gas line will be run from the street to the home.
#12 Framing begins.
#13 The main electrical box is installed
#14 Roofing
#15 The 4-way process begins. Plumbing, electrical & HVAC
#16 Inspection from the city to confirm the work has been done to code + 4-way meeting with buyers.
#17 Insulation is hung.
#18 Soffit, fascia, stucco, or siding & any brick or stone installation.
#19 The tub & shower surrounds installed.
#20 Sheet rock/drywall, is hung. Mud, tape & texture the walls.
#21 The finish workers install the baseboards, door casings & shelving for closets.
#22 Fireplace, exterior doors & windows installed.
#23 Paint
#24 Decks, concrete patios, walkways, the porch, steps to the porch. & the driveway.
#25 The large exterior garage doors installed.
#26 Vinyl &/or tile floors are laid.
#27 Cabinets are installed in kitchen & bathrooms
#28 Laminate &/or wood floors installed
#29 The electrician will come back to add fixtures & complete final tasks
#30 Final HVAC
#31 knobs or pulls for your cabinets are mounted
#32 Carpet is installed
#33 Countertops are placed in the kitchens & the bathrooms
#34 Bathroom mirrors & shower doors installed
#35 Finish plumbing will be completed including installation of plumbing fixtures
#36 Appliances installed. Builders usually include a dishwasher, microwave & stove with the purchase of the home
Now, all major items should be completed
#37 The superintendent aka the construction manager will do a quality walk making a punch list of items that still need to be completed. This usually includes blue tape to mark any locations that need paint touch up. The house will also get a quick cleaning
#38 The homeowner orientation aka the final walkthrough for the buyer. At this appointment, the builder’s representative will show you how to work your home & you’ll be able to point out any work that hasn’t been completed. Most builders require 5-7 days to complete these final items
#39 The home will receive a final cleaning
& most builders will schedule a final homeowner walk through to confirm the final touch ups & repairs have been completed
#40 You can now close on the Home. Usually, you’ll head to a title company to sign your closing documents. Once the home funds & records with the city, you’ll receive the keys to your home
Видео How Long is it Going to Take to Build My House - How a House is Built канала Ty the Real Estate Guy
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![Everything You Should Know About The 4-way - Pre Drywall Inspection - What is the 4-way Walk Through](https://i.ytimg.com/vi/19t9pCTEn20/default.jpg)
![](https://i.ytimg.com/vi/CjglNdvaSY4/default.jpg)
![How a Home is Built The Most In-Depth Video](https://i.ytimg.com/vi/p9LlHOgfIeE/default.jpg)
![Ten Reasons Why You Should NOT Build a Home in 2022 - Why Building a Home Could be a HUGE Mistake](https://i.ytimg.com/vi/7DR4Nki13zw/default.jpg)
![How to Find the Owner of ANY Property (Vacant or Not)](https://i.ytimg.com/vi/adH42abofzM/default.jpg)
![The Step-by-Step Guide for Building a House - What's the Process of Building a Home](https://i.ytimg.com/vi/0_C1EjY3Yig/default.jpg)
![HACKS to PAY OFF Your HOME - How to pay off Your Home Quick](https://i.ytimg.com/vi/KaWlseabee8/default.jpg)
![What Should I Know Before I Close on My New Construction Home - Closing Process with Home Builders](https://i.ytimg.com/vi/6wPkzilTqKE/default.jpg)
![How long does it take to build a house // A Detailed General Timeline](https://i.ytimg.com/vi/4DbgJQqTzkY/default.jpg)
![How Much Does It Cost To Install A Well | 10 Acres Of Raw Land | Well Water, Electric, Septic](https://i.ytimg.com/vi/sUy6VwwR-mg/default.jpg)
![Pre Construction Meeting: Questions and What to Expect](https://i.ytimg.com/vi/EPmXF4Ey9y4/default.jpg)
![Is it Good Timing to Sell Your House - When Should You List Your Home to Make the Most Money](https://i.ytimg.com/vi/JWyQ8aOEs8o/default.jpg)
![Housing Market: Is There A Slow Down Coming In 2022?](https://i.ytimg.com/vi/XmMteYXtPJQ/default.jpg)
![FOUR Homes SOLD in less than 36 hours - A Day in the Life of a Real Estate Agent](https://i.ytimg.com/vi/2rjIPz-GW4A/default.jpg)
![New Home FINAL WALK-THROUGH with Homebuilders. The Guide on How to navigate the Home Build Process.](https://i.ytimg.com/vi/4hzRcYekMrM/default.jpg)
![The Most In-Depth video on the New Home Construction Process. How a Home is Built. Part 3 of 3](https://i.ytimg.com/vi/09nvri9WUFE/default.jpg)
![Why You SHOULD Use The Homebuilder’s PREFERRED LENDER. Should You Use the Builders Preferred Lender?](https://i.ytimg.com/vi/CHKe0bI0AgY/default.jpg)
![Why Does it Take so Long to Build My House – The Home Build Process Explained](https://i.ytimg.com/vi/hL8CmoI8V4I/default.jpg)
![How to Buy a Home for the First Time - How to Buy a House 2022](https://i.ytimg.com/vi/JKUIffV-s1k/default.jpg)
![What Not to Fix When Selling a House](https://i.ytimg.com/vi/udAYp7y9bSI/default.jpg)