Building A Shed Pad
Today's job was building a pad for 10'x14' shed. I stripped the grass and topsoil off and hauled it away using the International then went got 8.5 tons of base rock. These jobs are why I keep the International, I was able to drive it thru the gate and get the rock right to the pad. I leveled it out, wet it down then tracked it in. So now he will have a nice level pad when the shed arrives. Thanks for watching! #EliteEarthworks #Takeuchi #shedpad
Видео Building A Shed Pad канала Elite Earthworks LLC
Видео Building A Shed Pad канала Elite Earthworks LLC
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Extending A 2" IPS Water MainFinishing The Crawlspace Backfill After 313 Loads Of ClayRoughing in some yardsPrairie Hills Is Almost Done!Laid Sod, Graded A Driveway Approach And Dug A FootingBackfilling A Retaining Wall And Rough GradingBackfilling Along The Foundation And The Back PatioDigging A House Footing On A Small LotSpreading Dirt With The Dozer To Shape A YardDigging The Crawl SpaceBackfilling Porches With The 912 HydremaBurning Brush At A Dump SiteBackfilling And Grading Around The FoundationMoving And Spread Rock With A BackhoeFinishing Installing The Downspouts And Moving Dirt OnsiteThe Devin Dyer Show Podcast ClipTearing Down A Burnt HouseLoading Out 110 Dump Trucks In One DayCutting Out A Hillside To Extend A Gravel LotClearing More Brush And Grading With The Dozer At The Basement JobFinishing The Rock On The Building Approach