Tesla Terafactory Texas Update #79 in 4K: Concrete Columns Up North - 12/22/20 (5:00pm)

Welcome back guys, it’s Randy! Today’s video shows some interesting developments happening all over the site and a couple of new things signaling what’s to come. One of these developments is the locating and raising of concrete columns directly east of the northern steel structure, which started yesterday and I completely missed in yesterday’s video.

There’s a lot to cover so let’s jump to today’s key takeaways:
- On the north end, we can see that the far north section of the steel structure is completely filled in with the required beams and columns. The spreading of the steel decking on each level and roof are what remains before we see other things start happening. At about the center point of this structure on the east side, is where we can see where crews have started erecting the concrete columns and were actively placing the third one with the fourth on the ground nearby as well.
- On the east side, the “zipper” will be no more after today as crews have completed work with the deep foundation and footings in the area and have started covering everything back up with soil so that only the tops of each footing are exposed. The perimeter grade beam on this side is also now having concrete poured.
- The south end shows the formwork removed from the 3 new footings nearest the power lines from yesterday and are in the process of being covered. Roofing sections continue to be added on the west side over the isolation foundation and something that myself and others have been wondering was how were they going to get the crane pictured in the inner portion of the isolation foundation out of its current location and it looks to be that they are fine just driving it atop the concrete that covers the isolation foundation, given that we can see tracks leading directly to this area, along with wood blocks and other materials used as shims to help make the difference between the height of the concrete and ground around it more consistent. This definitely lets us know how well this structure is built since they have the confidence to drive one of these huge cranes with all of the counterweights in place on top of the structure!
- On the west side of the site, the steel structure is now having columns placed that indicate that they will build this structure out to the north initially. It’ll be exciting to see how quickly this one can take shape once the other cranes are operational.
- On the far east side, in the large area where the switchyard is supposed to be, we can see that there is a new field trailer towards the north and some deliveries have taken place around it. In the area further south, where the large group of field offices have been relocated, we can see that a new trench is being dug directly to the east of the trailers and this one looks to actually be the type for electrical and utilities. Let me know what you guys think about the new developments in this area in the comments below.

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

NOTE: The nearest lanes of highway traffic are traveling North, so keep that in mind if you are curious as to which direction is which when watching the video(s).

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 12-22-20
Time of Day: Late Afternoon - 5:00pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Violet Spirit - Dan Henig
Stardrive - Jeremy Blake

Видео Tesla Terafactory Texas Update #79 in 4K: Concrete Columns Up North - 12/22/20 (5:00pm) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
23 декабря 2020 г. 19:38:55
00:24:33
Другие видео канала
Tesla Terafactory Texas Update #80 in 4K: Extending The Steel Structure South - 12/23/20 (5:00pm)Tesla Terafactory Texas Update #80 in 4K: Extending The Steel Structure South - 12/23/20 (5:00pm)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #66 in 4K: First Casting Roof Pieces Installed - 12/01/20 (5:00pm)Tesla Terafactory Texas Update #66 in 4K: First Casting Roof Pieces Installed - 12/01/20 (5:00pm)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #228 in 4K: Pre-Holiday Push 11/23/21 (5:00pm | 68°F)Tesla Terafactory Texas Update #228 in 4K: Pre-Holiday Push 11/23/21 (5:00pm | 68°F)Giga Berlin | 2020-12-12 | Model Y bodiesGiga Berlin | 2020-12-12 | Model Y bodiesTesla Gigafactory Austin 4K  Day 60 - 9/20/20 - Tesla Terafactory Texas  - CONSTRUCTION DISNEYLAND!Tesla Gigafactory Austin 4K Day 60 - 9/20/20 - Tesla Terafactory Texas - CONSTRUCTION DISNEYLAND!Giga Berlin | 2020-11-21 | Progress updateGiga Berlin | 2020-11-21 | Progress updateTesla Terafactory Texas Update #224 in 4K: Back on the Scene 11/16/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #224 in 4K: Back on the Scene 11/16/21 (5:15pm | 78°F)Tesla Gigafactory Austin 4K  Day 53 - 9/13/20  Terafactory TX - Amazingly Gorgeous & Productive Day!Tesla Gigafactory Austin 4K Day 53 - 9/13/20 Terafactory TX - Amazingly Gorgeous & Productive Day!Tesla Terafactory Texas Update #227 in 4K: Major Pond Updates 11/22/21 (5:00pm | 65°F)Tesla Terafactory Texas Update #227 in 4K: Major Pond Updates 11/22/21 (5:00pm | 65°F)Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F)Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #75 in 4K: Reaching The North End - 12/15/20 (5:00pm)Tesla Terafactory Texas Update #75 in 4K: Reaching The North End - 12/15/20 (5:00pm)Tesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)
Яндекс.Метрика