Tesla Terafactory Texas Update #228 in 4K: Pre-Holiday Push 11/23/21 (5:00pm | 68°F)

Welcome back everyone, it’s Randy! Today’s footage shows some really cool updates around the site as the workers push to complete many items on their lists before the Thanksgiving break. The work at both of the large detention ponds continues to amaze me with the differences we’re seeing on a daily basis and there definitely is a push to get many of the remaining windows installed around the building. As a quick reminder, this will be my last video for the week due to family coming into town for the Thanksgiving break. Everyone be safe and enjoy the holiday with friends and family!

Here are today’s key takeaways:
- The GigaPress area shows the spaces for the windows facing the north have been covered with plastic and on the ground in front of the angled corner, work has started to create forms so that concrete can be poured here. On the east side of this building, we can see work in progress prepping the ground on this side so that they can then build forms and pour concrete here as well.
- The BIW area shows the finished section of concrete we saw being poured yesterday and we can see expansion joints cut in all of the recently poured slabs.
- The East detention pond vegetation is being planted and we can see a solid effort with the layout of all of the plants and grasses being applied to the area. We also see work being done on the large drainage pipes in the area next to the concrete, as it looks like they will add some bends to join the two sections of pipe next. A look at the overflow drainage channel in this area shows that they have started applying hydromulch to the banks of the channel, starting near the water and working back up towards the factory.
- The Stamping area shows the PSC cranes loaded with heavy equipment that looks like it’s about to be moved onto the modular transporter.
- The southern gap south end shows that the smaller steel beams we saw in the area yesterday have now been added to the structure to make a horizontal section spanning the entire width of the gap.
- Over at the south detention pond, the south wall overflow system looks like the box they were forming is nearly completed, so it’s possible we’ll see concrete poured any day now. The wall area shows lots of fill soil being brought in and graded as the ground around the system is shaped to assist with directing water. The progress on the drainage weir splitter box is still ongoing. We can see a large amount of wood and other materials now in the area so we’ll most likely see additional forms being made in the top section of the box next.
- These red beams caught my attention on the south end of the GA building just to the left of where cranes that finished the steel work were located. Let us know in the comments if you recognize what these might be or their purpose.
- The BCP building window installation is moving quickly as we can now see the bottom row with the majority of the windows installed when there were none on the previous day.
- Lastly, Tesla Road and all of the surrounding roads at the intersections have all had road and traffic markings applied and the entire area is super nice and smooth to drive on!

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended (I’ll earn a small commission):

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 11-23-21
Time of Day: Late Afternoon - 5:00pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Innocence - The 126ers
Violet Spirit - Dan Henig

Видео Tesla Terafactory Texas Update #228 in 4K: Pre-Holiday Push 11/23/21 (5:00pm | 68°F) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
24 ноября 2021 г. 19:15:45
00:20:50
Другие видео канала
Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #233 in 4K: Drainage System Complete??? 12/06/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #233 in 4K: Drainage System Complete??? 12/06/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #229 in 4K: Review Complete 11/29/21 (3:30pm | 72°F)Tesla Terafactory Texas Update #229 in 4K: Review Complete 11/29/21 (3:30pm | 72°F)Tesla Terafactory Texas Update #227 in 4K: Major Pond Updates 11/22/21 (5:00pm | 65°F)Tesla Terafactory Texas Update #227 in 4K: Major Pond Updates 11/22/21 (5:00pm | 65°F)Tesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #224 in 4K: Back on the Scene 11/16/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #224 in 4K: Back on the Scene 11/16/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #223 in 4K: Huge Week of Updates 10/25/21 (5:45pm | 87°F)Tesla Terafactory Texas Update #223 in 4K: Huge Week of Updates 10/25/21 (5:45pm | 87°F)Tesla Terafactory Texas Update #222 in 4K: Soaked But Still Progressing 10/14/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #222 in 4K: Soaked But Still Progressing 10/14/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #220 in 4K: New Tesla Headquarters 10/07/21 (4:15pm | 92°F)Tesla Terafactory Texas Update #220 in 4K: New Tesla Headquarters 10/07/21 (4:15pm | 92°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #218 in 4K: More Road & Exterior Updates 09/30/21 (5:30pm | 94°F)Tesla Terafactory Texas Update #218 in 4K: More Road & Exterior Updates 09/30/21 (5:30pm | 94°F)Tesla Terafactory Texas Update #217 in 4K: Prepping For Southern Gap Steel 09/27/21 (5:15pm | 92°F)Tesla Terafactory Texas Update #217 in 4K: Prepping For Southern Gap Steel 09/27/21 (5:15pm | 92°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F)Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)
Яндекс.Метрика