Hey everyone, it’s Randy! Today’s footage shows lots of new updates in various areas all around the site and we also see another major milestone achieved in that all of the west-facing wall panels of the factory have been installed. We also take some time to look at the increased activity in the far northeast section of the site. There’s a lot to cover so let’s jump right into it!

Here are today’s key takeaways:
- The north end shows some new excavations taking place on each side of the road.
- The GigaPress area shows the large formed area we saw at the north end has already had concrete poured and we can see the resulting slab. We also get a look at the assembly progress of machine #3 as well.
- The east side of the BIW section shows formwork still in progress for additional concrete slabs and we can also now see some of the prep work for the road extending further south towards Stamping. On the roof, we can see the progress of the stairwell structure we saw that work started on yesterday. Still on the roof and closer to the paint shop, we get a closer look at the area that was opened up in the roof directly above the chillers on the floor below.
- The southern gap shows the progress of the work to bury the footings in the center of the pit and creating new ones along the sides.
- The southwest corner near the bridge shows new paths being worked on to properly connect the road on the west side of the factory to the one running beneath the bridge.
- The GA west side again shows the wall panel installation has finally reached the south end and we now have all wall panels installed on this entire face of the building. Along the angled corner, we can see the disassembly of one of the large yellow cranes taking place. Up north, we see the new taller window installation still progressing nicely, but at the center of the image we can see a lot of dock levelers have been delivered. The question is, where will these actually be installed because there are not that many available dock openings currently available to have these installed, so what are we missing here? Leave a comment below if you have an idea.
- The BCP building shows a couple of large pieces that go to the bridge crane. Joe was able to capture images of the entire 18-wheeler driving into the building via the ramp next to these parts earlier this morning.
- Next, we see the new makeshift detention pond north of the worker parking lot just across HGR and then get a look at the far northeast part of the Bobcat Project area to check out what’s been happening in this section of the site.
- We wrap up with a look at the concrete that has been poured atop the south end of the northern gap.

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended:

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 09-22-21
Time of Day: Late Afternoon - 7:00pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Drifting at 432 Hz - Unicorn Heads

--------------------------------------------

Additional Info

Joe’s 09/22/2021 Video: https://www.youtube.com/watch?v=7ZHK0FSz1_c

Видео Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
23 сентября 2021 г. 18:11:18
00:23:02
Другие видео канала
Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #233 in 4K: Drainage System Complete??? 12/06/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #233 in 4K: Drainage System Complete??? 12/06/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #232 in 4K: Paving In Overdrive Pt2 12/02/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #229 in 4K: Review Complete 11/29/21 (3:30pm | 72°F)Tesla Terafactory Texas Update #229 in 4K: Review Complete 11/29/21 (3:30pm | 72°F)Tesla Terafactory Texas Update #228 in 4K: Pre-Holiday Push 11/23/21 (5:00pm | 68°F)Tesla Terafactory Texas Update #228 in 4K: Pre-Holiday Push 11/23/21 (5:00pm | 68°F)Tesla Terafactory Texas Update #227 in 4K: Major Pond Updates 11/22/21 (5:00pm | 65°F)Tesla Terafactory Texas Update #227 in 4K: Major Pond Updates 11/22/21 (5:00pm | 65°F)Tesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #225 in 4K: Mega Drainage Structures 11/17/21 (5:15pm | 82°F)Tesla Terafactory Texas Update #224 in 4K: Back on the Scene 11/16/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #224 in 4K: Back on the Scene 11/16/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #223 in 4K: Huge Week of Updates 10/25/21 (5:45pm | 87°F)Tesla Terafactory Texas Update #223 in 4K: Huge Week of Updates 10/25/21 (5:45pm | 87°F)Tesla Terafactory Texas Update #222 in 4K: Soaked But Still Progressing 10/14/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #222 in 4K: Soaked But Still Progressing 10/14/21 (5:15pm | 78°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #220 in 4K: New Tesla Headquarters 10/07/21 (4:15pm | 92°F)Tesla Terafactory Texas Update #220 in 4K: New Tesla Headquarters 10/07/21 (4:15pm | 92°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #218 in 4K: More Road & Exterior Updates 09/30/21 (5:30pm | 94°F)Tesla Terafactory Texas Update #218 in 4K: More Road & Exterior Updates 09/30/21 (5:30pm | 94°F)Tesla Terafactory Texas Update #217 in 4K: Prepping For Southern Gap Steel 09/27/21 (5:15pm | 92°F)Tesla Terafactory Texas Update #217 in 4K: Prepping For Southern Gap Steel 09/27/21 (5:15pm | 92°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #216 in 4K: Many Exterior Updates 09/23/21 (7:15pm | 80°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)Tesla Terafactory Texas Update #213 in 4K: North End Roof Gaps Filled 09/17/21 (7:15pm | 91°F)
Яндекс.Метрика