Building The Shop Pad
Started building the shop pad today to eat up some of this fill dirt and make room for the dirt that will come out of the walk out area. I didn't film a ton of this cause there is only so many ways or angles to show building a pad. I got all the mud and soft junk scrapped off to more solid ground, then spread the clay in 6"-8" lifts and tracked. There is so much moisture in this clay that it's packing in great. Thanks for watching! #EliteEarthworks #Takeuchi #buildingpad
Видео Building The Shop Pad канала Elite Earthworks LLC
Видео Building The Shop Pad канала Elite Earthworks LLC
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Extending A 2" IPS Water MainFinishing The Crawlspace Backfill After 313 Loads Of ClayGrading The Crawl Space With The Spectra Laser ReceiverRoughing in some yardsPrairie Hills Is Almost Done!Laid Sod, Graded A Driveway Approach And Dug A FootingBackfilling A Retaining Wall And Rough GradingBackfilling Along The Foundation And The Back PatioSpreading Dirt With The Dozer To Shape A YardSpreading Rock With The 2150Digging The Crawl SpaceBurning Brush At A Dump SiteMore Clay Going In, The Track Is Coming AlongFinishing Installing The Downspouts And Moving Dirt OnsiteThe Devin Dyer Show Podcast ClipTearing Down A Burnt HouseCutting Out A Hillside To Extend A Gravel LotClearing More Brush And Grading With The Dozer At The Basement JobFinishing The Rock On The Building ApproachSpreading Topsoil Along A New Concrete DrivewaySpreading Rock Around The Catch Basin