Загрузка страницы

Part 3: Digging a 9 ft Well With a Shovel

You can now support our channel! Learn more
http://www.simpleground.com/supportus.html

This is the final stage of building the well. It involves pumping the water clear, testing the water, and filing the correct paperwork. There were a lot of things that surprised us with this one. First, it took a long time to pump the water clear, like more than one day. The second surprise was how much the setup slowed the flow of the water. The water was rushing in while we were digging and it slowed down to 3-4 gpm. The last surprise was how easy it was to contaminate the well, luckily it was just as easy to disinfect it. This part of the process took soooo long to finish. I am so glad it is done.

Part 1
https://youtu.be/nNSmNS62or0

Part2
https://youtu.be/RLu7CUdCxDM
Patreon: www.patreon.com/simpleground
Be sure check out our other content.

Website: www.simpleground.com
Patreon: www.patreon.com/simpleground

Instagram: www.instagram.com/simplegroundjourney
Pinterest: www.pinterest.com/simpleground/

Видео Part 3: Digging a 9 ft Well With a Shovel канала Simple Ground
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
16 декабря 2016 г. 9:29:06
00:13:20
Яндекс.Метрика