72" Linestop Services through a 48" Hottap on Pre Stressed Concrete Pipeline (PCCP) with By Pass
The City of Kansas City presented IFT with the opportunity to provide our services in order to allow the replacement of 72” valves on a Pre-Stressed Concrete Cylinder Pipe (PCCP) sewage force-main. Their 72” force-main being under pressure was a critical component of the Kansas City sewage collection system and the line could not be shut down.
Continuation of the raw sewage flow was performed by direct pumping from the wet-well into two 48” temporary pipelines that were hot tapped upstream of the 72” Linestop®. The 72” Linestop® plugged sewage from heading toward the wet well infrastructure thus allowing various large diameter valves to be replaced without a shutdown.
This raw sewage was successfully bypassed with use of the IFT Linestop® so the 72” pipeline remained active while the system was upgraded. IFT provides Large Linestop® services on most types of pipelines through 78”. IFT now headed to Houston to perform another 72” Linestop.
https://www.linestop.com/featured-work/missouri/72-linestop-through-a-48-hot-tap/ift-featured-missouri-job-48-hottap-for-a-72-linestop-with-a-48-by-pass
Job Status: Successful and Completed
Job Date: October 28, 2016
Location: Kansas City, MO
1 - Hottap 72" x 48'' Pre Stressed Concrete Pipeline (PCCP) with By Pass
1 -72" x 48" Hottap Fitting for PCCP (apx. 40-PSI)
(JCM 445 Shop Coated with Epoxy Coated Water Way)
1 -Installation of Hot Tap Fitting
(Others to Provide 48" Gate Valve with Installation and Provide Support of Valve)
1 - Pressure Test of Assembly & 48" Hottap
1- 48" Loaner Valve
Loaner 48" Knife Gate for Bypass- Removed Under Pressure after By Pass is Terminated.
Includes Setting 48" Completion Plug and Supply Blind Flange with Zinc Plated NBG Sets.
1 - 72" Linestop Fitting for PCCP- 72" Inside Diameter (ID) (40 PSI or less) Less than 6 FPS
(JCM 445 Shop Coated with Epoxy Coated Water Way)
1- Hot Tap to Allow for Linestop Entry
1 - Insertion of 72" Linestop
1 - 4'' Saddle with Gate Valve and Tap for Blow Down and Equalizing Pressure to Remove Linestops
1- Removal of Linestop, Install Completion Plug and Blind Flange Linestop Held for (7) days.
Linestop® • Valve Inserting • Pipefreeze® • Large Tapping
Linestop® is a registered Trademark and Servicemark of International Flow Technologies, Inc.
Видео 72" Linestop Services through a 48" Hottap on Pre Stressed Concrete Pipeline (PCCP) with By Pass канала International Flow Technologies, West
Continuation of the raw sewage flow was performed by direct pumping from the wet-well into two 48” temporary pipelines that were hot tapped upstream of the 72” Linestop®. The 72” Linestop® plugged sewage from heading toward the wet well infrastructure thus allowing various large diameter valves to be replaced without a shutdown.
This raw sewage was successfully bypassed with use of the IFT Linestop® so the 72” pipeline remained active while the system was upgraded. IFT provides Large Linestop® services on most types of pipelines through 78”. IFT now headed to Houston to perform another 72” Linestop.
https://www.linestop.com/featured-work/missouri/72-linestop-through-a-48-hot-tap/ift-featured-missouri-job-48-hottap-for-a-72-linestop-with-a-48-by-pass
Job Status: Successful and Completed
Job Date: October 28, 2016
Location: Kansas City, MO
1 - Hottap 72" x 48'' Pre Stressed Concrete Pipeline (PCCP) with By Pass
1 -72" x 48" Hottap Fitting for PCCP (apx. 40-PSI)
(JCM 445 Shop Coated with Epoxy Coated Water Way)
1 -Installation of Hot Tap Fitting
(Others to Provide 48" Gate Valve with Installation and Provide Support of Valve)
1 - Pressure Test of Assembly & 48" Hottap
1- 48" Loaner Valve
Loaner 48" Knife Gate for Bypass- Removed Under Pressure after By Pass is Terminated.
Includes Setting 48" Completion Plug and Supply Blind Flange with Zinc Plated NBG Sets.
1 - 72" Linestop Fitting for PCCP- 72" Inside Diameter (ID) (40 PSI or less) Less than 6 FPS
(JCM 445 Shop Coated with Epoxy Coated Water Way)
1- Hot Tap to Allow for Linestop Entry
1 - Insertion of 72" Linestop
1 - 4'' Saddle with Gate Valve and Tap for Blow Down and Equalizing Pressure to Remove Linestops
1- Removal of Linestop, Install Completion Plug and Blind Flange Linestop Held for (7) days.
Linestop® • Valve Inserting • Pipefreeze® • Large Tapping
Linestop® is a registered Trademark and Servicemark of International Flow Technologies, Inc.
Видео 72" Linestop Services through a 48" Hottap on Pre Stressed Concrete Pipeline (PCCP) with By Pass канала International Flow Technologies, West
Показать
Комментарии отсутствуют
Информация о видео
17 ноября 2016 г. 2:32:33
00:02:24
Другие видео канала
Pipe FreezePlug Services 1/2 -36"IFT Linestop.com Folding Head Linestop Machine Pressure TestPipe Freeze ServicesInternationalFlow.com 24 x 24 inch Hottap with Coupon RetainedPipe Testing using liquid nitrogen freeze plugs to help in hydrostatic testingClinton Keith Expansion Murrieta, CASanta Maria KCOY 12 News Report on our Water Main Linestop ProjectIFT Insert Valve Install for the City of Glendale42" Mechanical Linestop in Glendale, Arizona HD + Drone Video30" Hot Tap on Water Pipeline for a 42" Linestop HD + Drone FootageTeam Insert Valve Demo AnimationIndustrial Crude Oil Pipe Freeze Plug ServicesPipeFreeze com - Pipe Freezing ServicesFreezePlug.com presents : Leak Detection in 30 secondsIndustrial Pipeline Freeze Plug ServicesBigTap.com 1/2-72" Pipeline Linestop Plugging ServicesInsert Valve Installations Slideshow of Past InstallsValve Installations and Replacements ServicesIFT 8 Insert Valve Instalation at the University of Southern CaliforniaPipe Freeze Services