Tesla Terafactory Texas Update #125: Giga Press Foundry Exhaust Stack - 03/18/21 (5:00pm | 74°F)

What’s going on guys, it’s Randy! Today’s video shows lots of updates as usual with many revolving around the groundwork for the utility infrastructure and other systems. I was fortunate enough to get a quick look at the Giga Press exhaust stack for the foundry having additional installation work done, as we could barely see a small section of it coming through the roof in yesterday’s video and in the video prior, it was not visible from the roof at all.

Here are today’s key takeaways:
- In the northeast corner, we get a decent look at the exhaust stack being built that will allow the foundry used to melt the aluminum for the castings to properly vent the gases produced from the process. We can see the foundry still covered with the blue tarp and positioned directly below the stack.
- On the perimeter path on the east side and also on the other side of the power lines to the east, we see the progress on the storm water management system pipe being installed. We see another section with a manhole access section on some of the pipe going in nearest the contractor trailers.
- The south end shows wall panel installation on the east side of the structure is complete, with the exception of the very top set of panels, which are awaiting the roof column extensions that are needed to attach them. The angled section is now having the remaining panels installed.
- The northwestern corner shows the perimeter grade beam trench now has all rebar in place and concrete is already being poured about halfway through the angled section. There also seem to be deep lines cut into the ground within this angled corner area that have several paths leading directly to specific footings. This leads me to believe that these are possibly for some type of cabling or conduit for electricity being fed into the building. Both of the pits in the middle of this section are having rebar and formwork installed, with the pit nearest to the paint shop being slightly ahead of the other one.
- Speaking of the paint shop, the installation progress of the section getting the panels shows that most of the panels on the wall nearest the crane are in place and they should probably finish having them all installed tomorrow or Saturday, depending on how difficult it takes to attach the top sections nearest the crane.
- The switchyard shows the trench containing conduit leading to the factory having major work done. We also see the first glimpse of how they might be trying to run the conduit under the road.

If you’re new here, please be sure to like, subscribe, and hit the notification bell if you want to be kept up-to-date with the latest content. If you enjoy it, please consider supporting the channel on Patreon via the links in the description or at the end of the video.

--------------------------------------------

Affiliate Links for Equipment Used or Recommended:

DJI Mavic Air 2 Fly More Combo w/Smart Controller: https://amzn.to/3pqD794
DJI Mavic Mini 2 Fly More Combo: https://amzn.to/3rtdLJH
DJI Mavic Mini Fly More Combo: https://amzn.to/34NZgq0
SanDisk 128gb Micro SD Card: https://amzn.to/3pqEftk

--------------------------------------------
Support Me On Patreon or PayPal

https://www.patreon.com/terafactorytexas

https://paypal.me/davismediasolutions

--------------------------------------------

Tesla Referral Code

https://ts.la/randy95094

--------------------------------------------

Date Filmed: 03-18-21
Time of Day: Late Afternoon - 5:00pm

--------------------------------------------

Social Media

Twitter: https://twitter.com/Terafactorytx
Instagram: https://www.instagram.com/terafactorytx/

--------------------------------------------

Additional Terafactory Texas Footage Channels
NOTE: We all film at different times throughout the day so check us all out in order to catch footage from certain times of the day.

@JeffRoberts - https://www.youtube.com/user/peterdog15
@JoeTegtmeyer - https://www.youtube.com/c/JoeTegtmeyer
@TxTerafactory - https://www.youtube.com/c/TexasTerafactory

--------------------------------------------

Giga Berlin Footage

The Wolfpack Berlin: https://www.youtube.com/c/thewolfpackberlin

--------------------------------------------

Music

Turn Up Burn Up - Diamond Ortiz
Simpler Times - The 126ers
Not Impossible - The 126ers

Видео Tesla Terafactory Texas Update #125: Giga Press Foundry Exhaust Stack - 03/18/21 (5:00pm | 74°F) канала Terafactory Texas
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
19 марта 2021 г. 13:47:28
00:23:26
Другие видео канала
Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Tesla Terafactory Texas Update #231 in 4K: Paving In Overdrive 12/01/21 (4:45pm | 76°F)Ambri: A Battery that Could Change the WorldAmbri: A Battery that Could Change the WorldEAV - Can these electric assisted vehicles change urban deliveries? | Fully Charged VEHICLESEAV - Can these electric assisted vehicles change urban deliveries? | Fully Charged VEHICLESGiga Berlin | 2021-03-06 | Giga Press Assembly & Office FurnitureGiga Berlin | 2021-03-06 | Giga Press Assembly & Office FurnitureTesla Terafactory Texas Update #128 in 4K: Severe Storms On The Way - 03/24/21 (5:00pm | 71°F)Tesla Terafactory Texas Update #128 in 4K: Severe Storms On The Way - 03/24/21 (5:00pm | 71°F)Giga Press Machines in Tesla ShanghaiGiga Press Machines in Tesla ShanghaiTesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)Tesla Terafactory Texas Update #219 in 4K: New Southern Gap Steel Going Up 10/04/21 (5:15pm | 90°F)TeraTexas GigaTexas Tesla Cybertruck 4680 Cell - Building a New Tomorrow - 3-17-2021 Wind Wind WindTeraTexas GigaTexas Tesla Cybertruck 4680 Cell - Building a New Tomorrow - 3-17-2021 Wind Wind WindTesla Gigafactory 4 Berlin | Giga Press installation | March 07, 2021 | DJI Mavic 2 Pro 4K VideoTesla Gigafactory 4 Berlin | Giga Press installation | March 07, 2021 | DJI Mavic 2 Pro 4K VideoTesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #226 in 4K: Steel Erecting Nearly Complete 11/18/21 (4:45pm | 65°FTesla Terafactory Texas Update #233 in 4K: Drainage System Complete??? 12/06/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #233 in 4K: Drainage System Complete??? 12/06/21 (4:30pm | 62°F)Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Terafactory Texas Update #234 in 4K: Closing Up The North End 12/06/21 (4:45pm | 72°F)Tesla Gigafactory 4 Berlin | Second Giga Press arrived | March 28, 2021 | DJI Mavic 2 Pro 4K VideoTesla Gigafactory 4 Berlin | Second Giga Press arrived | March 28, 2021 | DJI Mavic 2 Pro 4K VideoTesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #221 in 4K: New Massive Bridge Cranes Arrive 10/11/21 (4:45pm | 84°F)Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F)Tesla Terafactory Texas Update #215 in 4K: All West-facing Panels Installed 09/22/21 (7:00pm | 82°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #230 in 4K: Pond and Paving Focus 11/30/21 (5:00pm | 72°F)Tesla Terafactory Texas Update #229 in 4K: Review Complete 11/29/21 (3:30pm | 72°F)Tesla Terafactory Texas Update #229 in 4K: Review Complete 11/29/21 (3:30pm | 72°F)Tesla Terafactory Texas Update #218 in 4K: More Road & Exterior Updates 09/30/21 (5:30pm | 94°F)Tesla Terafactory Texas Update #218 in 4K: More Road & Exterior Updates 09/30/21 (5:30pm | 94°F)Tesla Terafactory Texas Update #119: Giga Press Bridge Crane Installed - 03/10/21 (5:00pm | 78°F)Tesla Terafactory Texas Update #119: Giga Press Bridge Crane Installed - 03/10/21 (5:00pm | 78°F)
Яндекс.Метрика