Загрузка страницы

ETTP Water Tower @ Oak Ridge DOE Reservation - Controlled Demolition, Inc.

Controlled Demolition, Inc. (CDI) of Phoenix, Maryland, USA (acting as Implosion Subcontractor to Main Demolition Contractor, Veterans Contracting Solutions Group (VCSG), LLC of Knoxville, Tennessee as contracted by the General Contractor, UCOR - URS | CH2M Oak Ridge, LLC) performs the successful explosives felling of the 365' tall, structural steel water tower located in the East Tennessee Technology Park (formerly the Oak Ridge K-25 Site) at the Department of Energy Reservation in Oak Ridge, Tennessee at 1:00 PM on Saturday, August 3, 2013.

Видео ETTP Water Tower @ Oak Ridge DOE Reservation - Controlled Demolition, Inc. канала TheLoizeauxGroupLLC
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
7 августа 2013 г. 23:19:53
00:02:49
Яндекс.Метрика