Загрузка страницы

How-to-install Electric panel & meter socket (helpful tips) to speed up your install.

(Helpful tips and tricks of the trade) on How to speed up your load center and meter socket install based on the 2017 N.E.C. codes.
Installing a Square D. Home line 40/80 panel with a lock-on neutral bar with a
200 amp main breaker and a 200 amp Semens underground feed meter socket on this 3000 sq. ft. residential home in Eden, Maryland area.
I hope this video was helpful and informative to you all. If you like this video please crush the like 👍 button and consider subscribing to my channel for future how to videos. Thanks and God bless.
(Hardware) used in this video to install the 200 amp meter socket and Arlington MM-18 meter base siding block on this residence are as follows---
4 qty. ¼ x 1" lag bolts temp.
2 qty. ¼ x 3½" lag bolts
4 qty. ¼" flat washers
2 qty. 5/16"nuts for spacers
2 qty. ¼ x 2" grade 5 bolts with 20 tpi.
2 qty. ¼"dia.x ½" length fanged t-nuts with 20 tpi.

Видео How-to-install Electric panel & meter socket (helpful tips) to speed up your install. канала Working Man🛠️Ron Doyle
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
20 ноября 2021 г. 5:00:36
00:49:42
Яндекс.Метрика