Tampa Embarks on a Massive Water Main replacement program using Trenchless
Tampa Mayor Jane Castor and Murphy Pipelines Andy Mayer at a press conference educating the public on a major water main replacement program that will replace over 100,000 feet of water main. The city selected the #trenchless process of pre-chlorinated pipe bursting to:
✅ reduce the environmental impact of construction
✅ expedite the project schedule
✅ maintain traffic flow
✅ reduce noise and dust
✅ reduce cost
✅ follow the existing utility path simplifying design
✅ maintain water service by using temporary services
✅ maintain the city's way of life during the project
►Follow Murphy Pipelines Online:
Instagram: https://www.instagram.com/murphypipelines/
LinkedIn: https://www.linkedin.com/company/murphypipelines
Facebook: https://www.facebook.com/murphypipelines
Twitter: https://twitter.com/MurphyPipeline
Website: https://www.murphypipelines.com/
YouTube: https://www.youtube.com/murphypipelines
#pipebursting #infrastructure
Видео Tampa Embarks on a Massive Water Main replacement program using Trenchless канала Murphy Pipeline Contractors
✅ reduce the environmental impact of construction
✅ expedite the project schedule
✅ maintain traffic flow
✅ reduce noise and dust
✅ reduce cost
✅ follow the existing utility path simplifying design
✅ maintain water service by using temporary services
✅ maintain the city's way of life during the project
►Follow Murphy Pipelines Online:
Instagram: https://www.instagram.com/murphypipelines/
LinkedIn: https://www.linkedin.com/company/murphypipelines
Facebook: https://www.facebook.com/murphypipelines
Twitter: https://twitter.com/MurphyPipeline
Website: https://www.murphypipelines.com/
YouTube: https://www.youtube.com/murphypipelines
#pipebursting #infrastructure
Видео Tampa Embarks on a Massive Water Main replacement program using Trenchless канала Murphy Pipeline Contractors
Показать
Комментарии отсутствуют
Информация о видео
22 июня 2023 г. 9:01:17
00:01:52
Другие видео канала
HDPE Squeeze Off Tool$65MM Emergency Design-Build | 54" & 48" Directional Drill of 7 miles of HDPE pipePre-chlorinated Pipe Bursting in Texas: Water Director InterviewProject Manager Interview | Pre-chlorinated Pipe bursting ProjectButt Fusion of Pull HeadBig Inch pipe 💪 #CompressionFit #hdpe #heavyequipmentStatic Pipe Bursting Pull Back Process in FloridaMurphy Pipelines Operations Director reviews our QA program and Finding SolutionsCompressionFit™ How does it work?Water Pipe Bursting Job Site in Residential NeighborhoodStatic Pipe Bursting Replacing PVC water main with HDPE🦅 Receiving Pit on a 42-inch HDPE CompressionFit installStatic Pipe bursting using Ductile SlitterBIG 48-inch Directional Drill in Florida 💥Growth in the Water Industry 📈Static Pipe bursting 100 ton equipment Pull Back ProcessTypical Day of Pre-chlorinated Pipe bursting | Trenchless Water Main ReplacementShuttle Rods During Static Pipe Bursting Replacing Water MainReplacing Steel Water Main with Static Pipe BurstingCompressionFit™ 27-inch Raw Water Pipeline Colorado