Загрузка страницы

Offloading a million barrels of oil in 36 hours

MODEC was responsible for the engineering, procurement,
construction, installation, commissioning and operations for
the 2,000,000 barrel storage capacity FPSO including
topsides processing equipment and a SOFEC external turret
to a series of subsea manifolds. MODEC will operate the
FPSO for ten (10) years with an additional ten (10) 1-year
options.

The facilities were also designed and will be installed for
ease of future expansion of topsides capacity.

For more information on Modec please visit: www.Modec.com

Видео Offloading a million barrels of oil in 36 hours канала MODEC Tube
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
16 сентября 2015 г. 1:04:48
00:03:55
Яндекс.Метрика