Загрузка страницы

I love it when a plan comes together

There have been occasions when I’ve strolled up to our building site expecting a hive of activity, only to discover the Mary Celeste (https://en.wikipedia.org/wiki/Mary_Celeste) .
Perhaps that’s an apt comparison, given the abandoned ship was found drifting somewhere between the Azores islands and the Portuguese coast in 1872 with no crew – what happened to them remains a mystery to this day.
Tumble weeds don’t even grow here, but I’d swear I’ve seen them in the corner of my eye on those days where a sprinkle of drizzle or an ominous weather forecast has kept everyone away despite a daunting list of deadlines.
Inoculated by past disappointments I wandered up the hill this week with low expectations, only to stumble into rush hour at Paddington Station.
I struggled to find a parking space among the various sized white vans, piles of newly delivered limestone cobbles, and rumbling trucks.
There were electricians and carpenters, gutter fitters and pool people, the plumber, the water guy, delivery drivers, and...drumroll please...the door and window installers!
Our hopes and dreams, our wishes and requests, our letters to Santa Claus...had all answered by the arrival of the PVC people and their large truck of fabulous frames and gorgeous glass.
We’re finally getting somewhere after the many months of transforming a scraggy eucalyptus forest into something approaching an off-grid eco-luxe resort.
And as the workers are seemingly focussing on the finishing line we’re hitting the buy button on chairs and tables, lamps and loungers, umbrellas and bedside tables...to get all the finishings – at least – in the post.
I wondered the scene with my mouth open. I love it when a plan comes together.
But what’s truly amazing is all our wonderful friends who have been dropping everything to answer our call for help.
“I’d like to help with some strimming,” John Rourke messaged a few weeks ago.
With the fire regulations deadline fast approaching for clearing land 50m from every building that is not something you say no to.
Our Scottish friend who lives about 45 minutes away in Cercal arrived with a car-load of strimming machines, all fuelled up and ready for action (he even brought his own water bottles to keep hydrated through the job!).
I’ve been putting off the annual weight-loss programme as long as possible and this was just the kick I needed to get things started.
I should know by now that strimmers emerge from their winter hibernation with missing parts, wobbly fittings and absent essentials which always require at least a couple of trips to the local Stihl shop.
John’s already been strimming his land for weeks and so was totally in the rhythm on the hillside while I was spending ages getting up to speed.
He stayed the night to get an early start and had sorted most of the land above the house before I’d really got anywhere in the citrus grove – moving all the dead agave flowers from last year and trying not to get too tangled up in the ancient un-irrigated grape vines and left over electric fence.
I’d patched up a dodgy wire-strimming fitting which lasted right up until it didn’t – when the whole thing flew off in every direction…including towards the side window of our neighbour Daniel’s car.
While I can’t say for sure that the exploding strimmer was responsible for his shattered glass, it’s probably more likely than a toad with a catapult.
While John strimmed ever onwards, the Stihl shop was sadly awaiting a delivery – providing me with just the excuse I needed to focus on something else for the time being.
And there has been plenty to focus on.
The post-it wall has remained stubbornly static as the daily demands of project managing the workers and keeping power humming and water running has required regular shuttle runs up and down the valley.
Pumps and the various workmen’s tools all running at once tended to trip the fuses, so it required careful management and repeated visits to the fuse box.
Filling the pool without a grid connection was always going to be ambitious, but we’d been told it had to be filled as soon as the final pebble and cement layer had been applied to protect the concrete from cracking in the sun.
A little rough mathematics rounded up to the unlikely figure of 70,000 litres needed to get the infinity pool overflowing, but the cost of bringing in fresh water was prohibitive (to say the least).
We’d stored about 180,000 litres in a pillow tank at the bottom of the valley, and water consultant Rui Faria had the solar pump all connected and tested, but it only runs in the sun.
Thank you for reading Off-grid and Ignorant in Portugal. This post is public so feel free to share it.
We filled our new tanks with 30,000 litres ahead of time, but that was just a start – the key was going to be the boreholes which provide good, clean water and the slight saltiness ideal for a salt-water pool.
But right on cue – after years of working brillia...

Видео I love it when a plan comes together канала Alastair Leithead
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
28 апреля 2024 г. 20:42:41
00:08:46
Яндекс.Метрика