Загрузка страницы

Dust control during demolition: Wet-Wet-Wet Method

Effective July 1, 2018, the City of Portland requires dust control measures to be used for all demolitions of structures with 1-4 dwelling units built before 1978 and the accessory structures on those sites.

This video shows an established best industry practice for the Wet-Wet-Wet Method of dust suppression during demolition. This practice involves pre-wetting the structure being mechanically demolished, wetting during demolition, and wetting during material loading.

Other best management practices are required. More information can be found:

https://www.portlandoregon.gov/BDS/67326

Видео Dust control during demolition: Wet-Wet-Wet Method канала Portland Bureau of Development Services
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
25 августа 2018 г. 1:29:49
00:02:09
Яндекс.Метрика