Excavator Hitachi 470 - demolition site bridge

Prestressed concrete bridge on Viersener Strasse over the Hermann Piecq facility was built in 1967 as two separate superstructures. To save material, the bridge cross-sections are reduced. This bridge caused cracks to form in the supporting structures. New static calculations revealed further deficits in the load-bearing capacity. The load is exceeded in the area of ​​the ramp connection. The structural load-bearing capacity of the structure can no longer be adequately proven statically. To ensure traffic safety, it was decided to demolish the bridge. On each side, however, 3 old columns should be retained to support a new temporary bridge. Therefore, the remaining parts of the bridge are lifted off with the new Liebherr LTM 1650.
Technical specifications
Max. Load 700 t, with a 3.00 m radius, telescopic boom of 16.70 m, telescopic boom up to 80.00 m, lattice jib of 6.00 m, lattice jib up to 91.00 m, drive motor / make Liebherr, drive motor 8-cylinder -Diesel, drive motor / power 505 kW, number of axles 8, drive / steering standard 16 x 8 x 16, travel speed 85.00 km / h, total ballast 175.00 t

#ConstructionWorldXiuMeiHe

Видео Excavator Hitachi 470 - demolition site bridge канала Construction World
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
24 апреля 2021 г. 20:08:10
00:08:23
Яндекс.Метрика