Загрузка страницы

Excavator CAT 352 - demolition site

The building at Hellersbergstrasse 2 to 4 is being demolished by https://wiwa-abbruch.de/. Before being used as a vaccination center, the building was used by the Toshiba company.
The Quartier Hammfeld office in Neuss is the ideal location for companies that are looking for an inexpensive alternative to the Düsseldorf office market and still need proximity to the Rhine metropolis.
Hellersbergstrasse 2-4, 11-story commercial building with interesting office space for a wide range of requirements. In total, the office building covers approximately 42,000 m² of space. In 2001, the entrance halls and elevators were redesigned and equipped with high-quality natural stone. There are sufficient parking spaces available in the inner courtyards and in the two-story underground car park.

Currently on the construction site: Liebherr 960 Demolition, CAT 352 NG, CAT 345D and two Hitachi 250 and a Komatsu PC 360 NCL 11.
And the Hitachi 870 XXL from Kafril.
All my videos ➤ https://www.youtube.com/user/Fuximux/videos
#ConstructionWorldXiuMeiHe

Видео Excavator CAT 352 - demolition site канала Construction World
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
2 декабря 2023 г. 12:59:32
00:18:05
Яндекс.Метрика