Polymer high-pressure reinforced pipes in thermal insulation with an electric heating system
MIMIR ENGINEERING SOLUTIONS
Usage of polymer, reinforced, insulated pipes with an electrical heating system for the construction of medium pressure water lines at the Tazovskoye oil gas and condensate field
Development and joint production of pipes and fittings based at JSC "Plant of Polymer Pipes"
High pressure pipes reinforced with fibers and UD-tapes for systems with pressures up to 25 MPa
Complete cycle of fittings manufacturing
Delivery of products by owned vehicles
Delivery distance is 4400 km
Construction, installation and commissioning of hydraulic and electrical parts of relocatable medium pressure water line
Operation: preparation of pipes for assembly readiness on site: unwinding, welding of fittings and pulling of heating resistive cable, placement of pipes in assembly readiness along the field area. Use of special equipment - all-terrain vehicles: CHETRA, TROM, TREKOL
Flanged demountable connections of pipe sections
Electrical heating by TM Thermon resistive cable from two electrical substations supplied with the pipeline set
Piping shell made of UV-resistant polyethylene 153-10K
Mounting of flange fittings to pipes using butt and electrofusion welding ensures a reliable connection
Pulling of the heating cable can be carried out both in the factory as well in the field.
Pex-A cross-linked polyethylene cable duct
Length of the water line route is 8.9 km
- Total length of pipelines is 24.3 km
- Maximum pressure in the system is 50 ATM
Видео Polymer high-pressure reinforced pipes in thermal insulation with an electric heating system автора Мимир инжиниринг
Видео Polymer high-pressure reinforced pipes in thermal insulation with an electric heating system автора Мимир инжиниринг
Показать
Похожие видео
Macbook#Матплата Asus X553MA заказ 18715 - контрольный запуск.Производство армирующих UD лент для гибких полимерных армированных труб высокого давленияИнверторные и классические кондиционеры Байкал от МОРОЗКОКак охладить дымоходпроверка масла в компрессоре на кислотностьМимир инжиниринг - подрядчик реконструкции ТС на ОГБУЗ «Окружная больница Костромского округа №1»Производство ГПАТ TCP для систем высокого давления методом обмотки UD-лентамиКак Я собирал пк, но лоханулся.🤣🤣🤣🤣
и смешно и грустно одновременно.ограждение места препятствияИгровая клавиатура DEXP JAGGМимир инжиниринг Создание систем мониторинга рассказ РПТюменский нефтегазовый форум - Круглый стол «Новые материалы в нефтегазовой отрасли» - Бабенко Н. Г.Движение поездов при автоблокировке (1)Процессор Intel Core i7-10700Мимир инжиниринг - Новогодний корпоратив компании 2022-2023Линия непрерывной ППУ изоляции труб ГПАТ TCPПолимерные армированные трубы (ПАТ) с теплоизоляционным слоем (ТС) и системой электрообогрева (СО)сломаная петляКлассификация сигналов