This is a time lapse of the building of a 32x40x12 pole barn we had built. I had Attica Lumber build the barn, both inside and out. Steve Barnhart contracts for Attica Lumber and was the builder who constructed the building from start to finish. DL Smith Concrete excavated the site for building preparation and later poured the concrete. Paul Meyers and Shad McCoy of DP Garage Doors did the overhead doors. Mike Lorens did the electrical work. Riley Trucking hauled in the stone and dirt and graded the building site before and after. Construction started on September 30th, 2016 and was completed on November 17th, 2016. Total construction time was 19 days.