Загрузка страницы

BACLARAN TO CAVITE - 11.7 KM and 8 STATIONS LIGHT RAIL TRANSIT PROJECT.

South Extension Phase 1 (Line 1 South Extension)
A south extension of Line 1, also known as the South Extension Project or the Cavite Extension Project in the Metro Manila Rail Plans has been proposed and would aim to serve the areas of Parañaque to Cavite. Such an extension would take Quirino Avenue (Road from Parañaque to Bacoor) then would travel on the side of Seaside Drive to the Coastal Road, and from there would travel down the side of Kabihasnan street to Quirino Avenue (again) to its extension, General Emilio Aguinaldo Avenue from the Las Pinas-Bacoor Boundary of Zapote Bridge to Niog station. The extension would add 8 stations over some 11.7 kilometers (7.3 mi) of new line and would be the third rail line extending outside the Metro Manila area (after the east extension of Line 2 and the construction of Line 7).

An unsolicited bid to conduct this work from Canada's SNC-Lavalin was rejected by the Philippine government in 2005.[35] In 2006, the government worked with advisers (International Finance Corporation, White & Case, Halcrow and others) to conduct an open-market invitation to tender for the extension and for a 30-year concession to run the extended line. President Gloria Macapagal Arroyo subsequently withdrew the project.

The Line 1 South Extension Project will consist of the following eight stations:

Redemptorist – Parañaque
Manila International Airport – Parañaque
Asia World – Parañaque
Ninoy Aquino – Parañaque
Dr. Santos – Parañaque
Las Piñas – Las Piñas
Zapote – along the boundaries of Bacoor and Las Piñas
Niog – Bacoor

On May 4, 2017, the groundbreaking for the South Extension Project was held.[36] DOTr secretary Arthur Tugade projected the early completion of the project to be by 2020.[37][38]

The line would be extended from Parañaque southwards, connecting Las Piñas and Bacoor to the Mega Manila railway network. The actual construction officially started on May 7, 2019 because the right-of-way is "free and clear" from obstructions. The five stations from Baclaran to Dr. Santos in Parañaque are targeted to be partially operational by the end of 2021. The whole extension from Baclaran to Niog, Bacoor, Cavite will be finished by 2022.

South Extension Phase 2 (Line 6)
Main article: Manila Light Rail Transit System Line 6
Another extension of the line in Cavite has been proposed. It will be extended by another 19 kilometres (12 mi) from Bacoor to Dasmariñas with a right-of-way alignment along Aguinaldo Highway. This public-private partnership project dubbed as Line 6, it would have 6 additional stations in Cavite.

The 6 stations of the proposed South Extension Phase 2 are composed of:

Tirona – Bacoor
Imus – Imus
Daang Hari – Imus
Salitran – Dasmariñas
Congressional Avenue – Dasmariñas
Governor's Drive – Dasmariñas

Thanks for watching! I hope you enjoyed todays video.. If your new SUBSCRIBE to keep updated.

For more videos go here http://bit.ly/dadakoo

Thank You! See you again on my next vlog :D

Vlogging equipment;

Samsung Galaxy Mobile Phone S10
Gimbal Stabilizer (Osmo Mobile 2)

Видео BACLARAN TO CAVITE - 11.7 KM and 8 STATIONS LIGHT RAIL TRANSIT PROJECT. канала DADA KOO
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
24 декабря 2019 г. 16:03:29
00:17:06
Яндекс.Метрика