गंगा में गरम गर्मी व्यवस्था और प्रदूषण - Failures of Mission Ganga Cleaning #ganga #namami_gange
Challenges Faced by NMCG
Poor Governance: due to lack of proper monitoring and supervision there is less utilization of funds allotted under the programs.
Violation of e-Flow Norms: According to the Central Water Commission (CWC), 4 of the 11 hydropower projects on the upper reaches of the river Ganga’s tributaries are violating Ganga ecological flow (e-flow) norms which is further interrupting the natural flow of the river.
Pollution:
Due to the presence of five states (Uttarakhand, Uttar Pradesh, Jharkhand, Bihar, and West Bengal) on the river’s mainstream, most of the Ganga is polluted.
Industrial pollution from tanneries in Kanpur, distilleries, paper, and sugar mills in the Kosi, Ramganga and Kali river catchments are major contributors.
Illegal Construction: The problem of illegal and rampant construction near river beds has become a major hurdle in cleaning the river.
एनएमसीजी के सामने चुनौतियाँ
ख़राब प्रशासन: उचित निगरानी और पर्यवेक्षण की कमी के कारण कार्यक्रमों के तहत आवंटित धन का कम उपयोग होता है।
ई-फ्लो मानदंडों का उल्लंघन: केंद्रीय जल आयोग (सीडब्ल्यूसी) के अनुसार, गंगा की सहायक नदियों की ऊपरी पहुंच पर 11 में से 4 जलविद्युत परियोजनाएं गंगा पारिस्थितिक प्रवाह (ई-फ्लो) मानदंडों का उल्लंघन कर रही हैं जो प्राकृतिक प्रवाह को और बाधित कर रही हैं। नदी का।
प्रदूषण:
नदी की मुख्यधारा पर पाँच राज्यों (उत्तराखंड, उत्तर प्रदेश, झारखंड, बिहार और पश्चिम बंगाल) की उपस्थिति के कारण, गंगा का अधिकांश भाग प्रदूषित है।
कानपुर में चर्मशोधन कारखानों, डिस्टिलरीज, कागज और कोसी, रामगंगा और काली नदी जलग्रहण क्षेत्रों में चीनी मिलों से औद्योगिक प्रदूषण प्रमुख योगदानकर्ता हैं।
अवैध निर्माण: नदी तल के पास अवैध और बड़े पैमाने पर निर्माण की समस्या नदी की सफाई में एक बड़ी बाधा बन गई है।
Видео गंगा में गरम गर्मी व्यवस्था और प्रदूषण - Failures of Mission Ganga Cleaning #ganga #namami_gange канала NAVEEN KUMAR PATHI
Poor Governance: due to lack of proper monitoring and supervision there is less utilization of funds allotted under the programs.
Violation of e-Flow Norms: According to the Central Water Commission (CWC), 4 of the 11 hydropower projects on the upper reaches of the river Ganga’s tributaries are violating Ganga ecological flow (e-flow) norms which is further interrupting the natural flow of the river.
Pollution:
Due to the presence of five states (Uttarakhand, Uttar Pradesh, Jharkhand, Bihar, and West Bengal) on the river’s mainstream, most of the Ganga is polluted.
Industrial pollution from tanneries in Kanpur, distilleries, paper, and sugar mills in the Kosi, Ramganga and Kali river catchments are major contributors.
Illegal Construction: The problem of illegal and rampant construction near river beds has become a major hurdle in cleaning the river.
एनएमसीजी के सामने चुनौतियाँ
ख़राब प्रशासन: उचित निगरानी और पर्यवेक्षण की कमी के कारण कार्यक्रमों के तहत आवंटित धन का कम उपयोग होता है।
ई-फ्लो मानदंडों का उल्लंघन: केंद्रीय जल आयोग (सीडब्ल्यूसी) के अनुसार, गंगा की सहायक नदियों की ऊपरी पहुंच पर 11 में से 4 जलविद्युत परियोजनाएं गंगा पारिस्थितिक प्रवाह (ई-फ्लो) मानदंडों का उल्लंघन कर रही हैं जो प्राकृतिक प्रवाह को और बाधित कर रही हैं। नदी का।
प्रदूषण:
नदी की मुख्यधारा पर पाँच राज्यों (उत्तराखंड, उत्तर प्रदेश, झारखंड, बिहार और पश्चिम बंगाल) की उपस्थिति के कारण, गंगा का अधिकांश भाग प्रदूषित है।
कानपुर में चर्मशोधन कारखानों, डिस्टिलरीज, कागज और कोसी, रामगंगा और काली नदी जलग्रहण क्षेत्रों में चीनी मिलों से औद्योगिक प्रदूषण प्रमुख योगदानकर्ता हैं।
अवैध निर्माण: नदी तल के पास अवैध और बड़े पैमाने पर निर्माण की समस्या नदी की सफाई में एक बड़ी बाधा बन गई है।