Загрузка страницы

Building the TotalBoat work skiff - Over it goes (Episode 22)

It's finally time for us flip the skiff over, but first we need to finish attaching the runners to the bottom of the boat. In this video Lou is going to show you how he pre-drilled the runners with three different bits before nailing them down using 3 1/2-inch boat nails or cut nails. After that we'll saw off the over hanging ends of the runners and then touch them up with a handsaw, planer and chisel blade. Now we're gonna flip it over and take a look at all our hard work.

Subscribe to Tips From a Shipwright for more how-to videos
http://www.tipsfromashipwright.com
http://www.facebook.com/tipsfromashipwright
http://www.twitter.com/louissauzedde

Subscribe to TotalBoat for products and other how-to videos
http://www.totalboat.com
http://www.jamestowndistributors.com

Видео Building the TotalBoat work skiff - Over it goes (Episode 22) канала Tips from a Shipwright
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
9 декабря 2016 г. 6:08:01
00:19:12
Яндекс.Метрика