Загрузка страницы

Installation Of a New Mini Sewage Biodegradation Treatment Plant (part 2)

Here we will replace the entire sewage system and connect the new sewage pipe to the house.
We prepare the ground for 2 large tanks and 1 smaller one. In this episode we set tank nr1 .
We are also preparing the route for the piping of the new sewage line.

Excavator: TakeJob TB125
Excavator: Cat 307 Tiltrotator: Engcon
Wheel Loader: Volvo L50
Truck: Volvo FH 13
On the Ground: T.Ö. Hansson, Åberg & Hedblom
Camera: GoPro Black 7
Video Editing: iMovie
Location: Sweden
Instagram: m_hedblom

FAQ:
T.Ö Hansson is not my company, in my company it's just me.
I am hired as a machine operator by T.Ö. Hansson and I'm paid per hour.
They have 3-4 people out in the field + me and Åberg who have our own companies.
That means that I own none of the machines you see in videos and I don't know all the machine specifications.
It's also why I never answer price questions, it's between T.Ö Hansson and the customer.

Music:
Chapters/Music:
00:00 Intro
01:34 Arc De Soleil: PomPom Volcano
05:29 Bomull: Fruitful
10:22 Emil Fredenmark: Elden. http:/facebook.com/darknesslightproduction

Most of the music comes from Epidemic Sound.
Check them out at: https://www.epidemicsound.com/referral/o5ad5w/

Видео Installation Of a New Mini Sewage Biodegradation Treatment Plant (part 2) канала Hedblom
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
10 октября 2021 г. 13:00:29
00:14:29
Яндекс.Метрика