- Популярные видео
- Авто
- Видео-блоги
- ДТП, аварии
- Для маленьких
- Еда, напитки
- Животные
- Закон и право
- Знаменитости
- Игры
- Искусство
- Комедии
- Красота, мода
- Кулинария, рецепты
- Люди
- Мото
- Музыка
- Мультфильмы
- Наука, технологии
- Новости
- Образование
- Политика
- Праздники
- Приколы
- Природа
- Происшествия
- Путешествия
- Развлечения
- Ржач
- Семья
- Сериалы
- Спорт
- Стиль жизни
- ТВ передачи
- Танцы
- Технологии
- Товары
- Ужасы
- Фильмы
- Шоу-бизнес
- Юмор
HDB Block 640 Bedok Reservoir (Kaki Bukit) || 2023 Fujitec Elevator
Recorded on 14 February 2026. [VIDEO #6583] This is Block 640 Bedok Reservoir Road, one of the 17 residential blocks within HDB Tenaga Ville (Blocks 633-649 Bedok/Kaki Bukit cluster). It is located near DT28 Kaki Bukit along Downtown Line but along Eunos Link.
In this video, i'm showcasing 2 Fujitec Lifts (from 2023 times) - serving a total of 17 storeys overall since Selective Lift Replacement Programme (SLRP). Previously, Block 640 Bedok Reservoir Road was 2 Fujitec Lifts originally in 1992 - one of the first few HDB Blocks with windows from Fujitec.
Recorded during Valentine's Day 2026 and it was raining islandwide at that time.... Lastly, Blocks 638 to 642 were completed in March 1993 by HDB but the lifts were originally installed in late-1992, new era for Fujitec.
______________________
Here's the information for previous lifts within Blocks 633-649 Bedok/Kaki Bukit:
- Previously 1992 "windowless" Fujitec: 633-637 & 643-649
- Previously 1992 "window" Fujitec: 638-642
Here's the information for current lifts within Blocks 633-644 Bedok Reservoir:
- Replaced 2018 EM-Nidec: 633 & 642
- Replaced 2020 Fujitec: 634 to 637
- Replaced 2021 EM-BLT: 643 & 644
- Replaced 2023 Fujitec: 638 to 641
Specifications:
Floors served: 1 - 17
Manufacturer: Fujitec
Year Installed: 2023
Notes: Replaced 1992 Fujitec Lifts (with windows) under Lift Replacement Programme (LRP)
Видео HDB Block 640 Bedok Reservoir (Kaki Bukit) || 2023 Fujitec Elevator канала TRANSLAS Lion's City Innovia
In this video, i'm showcasing 2 Fujitec Lifts (from 2023 times) - serving a total of 17 storeys overall since Selective Lift Replacement Programme (SLRP). Previously, Block 640 Bedok Reservoir Road was 2 Fujitec Lifts originally in 1992 - one of the first few HDB Blocks with windows from Fujitec.
Recorded during Valentine's Day 2026 and it was raining islandwide at that time.... Lastly, Blocks 638 to 642 were completed in March 1993 by HDB but the lifts were originally installed in late-1992, new era for Fujitec.
______________________
Here's the information for previous lifts within Blocks 633-649 Bedok/Kaki Bukit:
- Previously 1992 "windowless" Fujitec: 633-637 & 643-649
- Previously 1992 "window" Fujitec: 638-642
Here's the information for current lifts within Blocks 633-644 Bedok Reservoir:
- Replaced 2018 EM-Nidec: 633 & 642
- Replaced 2020 Fujitec: 634 to 637
- Replaced 2021 EM-BLT: 643 & 644
- Replaced 2023 Fujitec: 638 to 641
Specifications:
Floors served: 1 - 17
Manufacturer: Fujitec
Year Installed: 2023
Notes: Replaced 1992 Fujitec Lifts (with windows) under Lift Replacement Programme (LRP)
Видео HDB Block 640 Bedok Reservoir (Kaki Bukit) || 2023 Fujitec Elevator канала TRANSLAS Lion's City Innovia
Комментарии отсутствуют
Информация о видео
Другие видео канала













