Corps tests spillway gates on Savannah River dams, July 2013
Check out this dramatic video of spillway gate tests on the Upper Savannah River Basin. The U.S. Army Corps of Engineers, Savannah District conducted the tests at the Hartwell, Richard B. Russell and J. Strom Thurmond Dams July 10 and 11, 2013. As part of the Dam Safety Program, we check the spillway gate mechanism to ensure they can be properly activated in an emergency.
Видео Corps tests spillway gates on Savannah River dams, July 2013 канала SavannahCorps
Видео Corps tests spillway gates on Savannah River dams, July 2013 канала SavannahCorps
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
Radial gates erection || Polavaram project status Episode-1Best Mini Dam Construction | Construction of mini hydroelectricityOahe Spillway GatesDual spillway gate test at Roosevelt DamOpening of Radial dam gateThe Most Dangerous DamsThe basics of using locks and damsDam Owner Academy: Spillways & Outlet WorksHartwell Dam Release June 19th 2018The White Salmon River after Condit damEmergency water discharges ¦¦ Dam water release ¦¦ Pressure ¦¦ Dam waterfall ¦¦ Crash FailsHow the gates on Warragamba Dam workChallenge at Glen Canyon (Part 3)Lake Dunlap Dam Fail 5 14 2019Radial gate dry lifting from downstream viewHow Do Spillways Work?ORBINOX Fixed cone valve - Summersville Dam USAOpening of the spillway gates at Robert-Bourassa generating stationLake Hartwell Dam, Hartwell South CarolinaHoover Dam Spillway Overflow 1983