Загрузка...

Deficiency of Energy Pakistani Face Load shedding News Today

To overcome the power shortage issue people have installed UPS in their houses. In commercial zones, organisations introduce generators to cope with load shedding. The consolidated limit of the generators introduced in the nation is more than the national power supply, which is 17,000 Megawatts.

According to RAFTAAR, the issue with the expanding number of generators and UPS being installed in organisations and at homes is that the power supplied by these machines is inefficient as compared to that, provided through the national grid.

Another solution to overcome power shortage is to produce electricity through renewable energy products. As per RAFTAAR, the country had the potential to produce about 120,000 Megawatts of wind energy.

-~-~~-~~~-~~-~-
Please watch: "Pak vs Aus warm up match 2023 |Loss Match PAK Live Score Highlights| Pak vs Aus | IC80NEWS"
https://www.youtube.com/watch?v=ITnyrkOtoOU
-~-~~-~~~-~~-~-

Видео Deficiency of Energy Pakistani Face Load shedding News Today канала IC80News 2k
Страницу в закладки Мои закладки
Все заметки Новая заметка Страницу в заметки