Gas Pipe Line Strymon River Crossing
The 36'' Gas pipe line crossed Strymon River, on November 1992. A quite special and unique construction work was performed. Strymon River bed, it was deviated.Αn embarkment was temporarily constructed above the river original bed.The embakement was stabilized by sheet piling parallel to the side of the excavation (before river side).Pipe trench was excavated inside river perpendicular to the river bed direction as per the pipeline route. The pipe spool of 265 tons, which it had been prefabricated well in advance, it was lowered into the trench inside river bed on the 8th of Novemebr 1992.All phases of construction are shown in detail at this video.
Видео Gas Pipe Line Strymon River Crossing канала Constantine Gouzias
Видео Gas Pipe Line Strymon River Crossing канала Constantine Gouzias
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![Progress Report, Alyeska Pipeline -- 1975](https://i.ytimg.com/vi/oI4yu01IAus/default.jpg)
![Gas Pipeline Section Lowering-in at River Crossing.](https://i.ytimg.com/vi/ytEThWr9kH8/default.jpg)
![Mud Creek Pipeline Crossing](https://i.ytimg.com/vi/2QEWgoiO4eQ/default.jpg)
![Edna PipeLine 36"](https://i.ytimg.com/vi/_rEwPRhJUEE/default.jpg)
![A new CAT 992K loading 773D Athey bottom dumps](https://i.ytimg.com/vi/pWrS9gsfQ8w/default.jpg)
![Rail Sleepers manufacturing process](https://i.ytimg.com/vi/FYhDw3Mqrqg/default.jpg)
![Installing Pipe Under the Hudson River](https://i.ytimg.com/vi/eK-M3vCKXBk/default.jpg)
![1967 OHIO PIPELINE](https://i.ytimg.com/vi/lq_JTTEpTW8/default.jpg)
![Natural Gas Pipelines Construction](https://i.ytimg.com/vi/_gW6EU0g6ys/default.jpg)
![INSANE ROAD CONSTRUCTION TECHNOLOGIES THAT ARE ON ANOTHER LEVEL](https://i.ytimg.com/vi/VspXR8_3k_k/default.jpg)
![3 Set Up](https://i.ytimg.com/vi/U97d7JmZ9zA/default.jpg)
![2 Bending](https://i.ytimg.com/vi/WWAcUqOGTpA/default.jpg)
![Pipe Installation](https://i.ytimg.com/vi/aWG8tPHV5y0/default.jpg)
![The Arapahoe (circa 1955)](https://i.ytimg.com/vi/0X9H8TalI3o/default.jpg)
![MCA 1 36 Splitframe Pipe Cutting & Bevelling machines](https://i.ytimg.com/vi/2QiydY2RH5Y/default.jpg)
![Crossing the river KOSINTHOS by a 48 inch pipeline to TAP](https://i.ytimg.com/vi/r9oD4P9nOiM/default.jpg)
![Canadian Pipeline Construction 1](https://i.ytimg.com/vi/ZYGnH_xGVfA/default.jpg)
![Longest HDD Crossing in Malaysia!](https://i.ytimg.com/vi/gZRuUUKbklI/default.jpg)
![Modern Pipeline Construction Animation | Pipeline Animation | Downhole Drilling Equipment Animation](https://i.ytimg.com/vi/CdTSMpl6I20/default.jpg)
![Bouchamaoui Industries References OMV Nawara PPL Project](https://i.ytimg.com/vi/owB8CjRU-rE/default.jpg)