Загрузка страницы

Backyard Pool & Deck Makeover 2016 - 1080p

Backyard Pool & Deck Makeover 2016
*This project was done with a permit and approved by the City Engineer and built to the local building codes.

It took 7 days to do this project, the deck was a 7 day, 1 person build with a few 1/2 days of rain that slowed things down.

What your Blueprints need to look like for a permit: https://www.dropbox.com/sh/iwy848rvkttohmy/AAAYZByVkllzK2XCztNuCnM4a?dl=0

Google Earth view of just how big the pool is (Winter Shots)
https://www.dropbox.com/sh/l5edzfru9c0xgjp/AAAuB4_i9QdfREyUD9jFMFEPa?dl=0

* NOTE: When building the Deck over the Pools Top Rail leave room to feed your winter cover through, 1" to 1" 1/2 inches spacing is good.

**And always think of security and safety when installing a pool.
ie: Lock all property yard fences, have all latches on the inner side as required by bylaw. And if possible a security camera aiming at the pool, deck and yard for liability reasons. I have a live feed set up so I can monitor my property & pool from any TV or PC in the house or when I'm on the road through my cell phone or tablet all in real time.

Examples: https://www.dropbox.com/sh/17xoamcano50am2/AACdCSIn-pWui6qFKXklgquAa?dl=0
Format 1080p

Also See:
Backyard Pool & Deck Makeover 2016 - Part 2 "The Final Cut"
https://www.youtube.com/watch?v=Ky5QYY019Kw

Видео Backyard Pool & Deck Makeover 2016 - 1080p канала Pat
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
28 июня 2016 г. 17:43:27
00:13:28
Яндекс.Метрика