LOFT CONVERSION - START TO FINISH IN 18 DAYS - Hip to Gable Conversion completed & ready to live in
In this video we take you on a whistle stop tour of the build from START TO FINISH of a high quality Hip to Gable Loft Conversion that was completed in just 18 days. The build took a long time to plan and we had to carefully organise the timing of the materials and tradesmen but it shows what can be done if you plan ahead.
This video contains lots of TIPS, IDEAS and CONCEPTS that we hope will be useful when you are planning your loft.
This is a compilation of a series of DAILY DIARY videos that we have posted on YouTube so if you would like more detail on any aspects of the build please refer to the specific daily diary video.
Thanks for watching and please subscribe now.
The Property Gurus.
Видео LOFT CONVERSION - START TO FINISH IN 18 DAYS - Hip to Gable Conversion completed & ready to live in канала The Property Gurus
This video contains lots of TIPS, IDEAS and CONCEPTS that we hope will be useful when you are planning your loft.
This is a compilation of a series of DAILY DIARY videos that we have posted on YouTube so if you would like more detail on any aspects of the build please refer to the specific daily diary video.
Thanks for watching and please subscribe now.
The Property Gurus.
Видео LOFT CONVERSION - START TO FINISH IN 18 DAYS - Hip to Gable Conversion completed & ready to live in канала The Property Gurus
Показать
Комментарии отсутствуют
Информация о видео
Другие видео канала
![Loft Conversion - Interior Design and Tour - Fantastic Ideas for Loft Bedroom & Ensuite Shower Room](https://i.ytimg.com/vi/SePgy44tMeM/default.jpg)
![Digging Soakaway Drains and Footings](https://i.ytimg.com/vi/WwFJQchUtrs/default.jpg)
![LOFT CONVERSION DAY 3 - Pitched Timber Roof Construction & Building Control Checks - Day 3 of 18](https://i.ytimg.com/vi/VtCaCQXCs68/default.jpg)
![ANOTHER GREAT STORAGE SPACE CREATED](https://i.ytimg.com/vi/8xiW9_EIbuI/default.jpg)
![Building an Impossible Dovetail Cutting Board](https://i.ytimg.com/vi/JhNoxW2yapA/default.jpg)
![LOFT CONVERSION DAY 7 - Dormer Roof Waterproofing (GRP Resin & Fibre Glass) - Day 7 of 18](https://i.ytimg.com/vi/lLDiGM_KbSE/default.jpg)
![LOFT CONVERSION DAY 2 - Demolition of Old Roof & Installation of Steel Beams - Day 2 of 18](https://i.ytimg.com/vi/iReVhxFhIMY/default.jpg)
![Putting up the Tyvek House wrap, render carrier board and tiling the side roof](https://i.ytimg.com/vi/_E9Bi2i_kJQ/default.jpg)
![FIRST LOFT JOB OF NEW YEAR](https://i.ytimg.com/vi/-3sVkug1Peg/default.jpg)
![Marking out Footings for Extension Build](https://i.ytimg.com/vi/JA_IpT4Pkz4/default.jpg)
![Loft Conversion Part 2 - Cutting & fitting the joists. Joist installation.](https://i.ytimg.com/vi/un7vUwkSrnk/default.jpg)
![LOFT CONVERSION DAY 6 - Roof Tiles, First Fix Plumbing & Electrics, Insulation - Day 6 of 18](https://i.ytimg.com/vi/QqXgQ8zkUo0/default.jpg)
![LOFT CONVERSION DAY 18 - COMPLETED - Tour of the Finished Bedroom & Ensuite Shower - Day 18 of 18](https://i.ytimg.com/vi/LitonQGyOM4/default.jpg)
![Loft Conversion RSJs ~ LoftCon #1](https://i.ytimg.com/vi/9jUBLwUYkCs/default.jpg)
![Complete 1930s semi detached house hip to gable loft conversion; start to finish](https://i.ytimg.com/vi/nW4mLmoPTgM/default.jpg)
![Basement Finishing From Scratch, Remodel Time Lapse](https://i.ytimg.com/vi/i0q6xpAnk-E/default.jpg)
![Side roof rafter construction](https://i.ytimg.com/vi/o-9HpoHNpe0/default.jpg)
![LOFT CONVERSION DAY 8 - Pitched Roof & Dormer Flat Roof (GRP Resin) Completion - Day 8 of 18](https://i.ytimg.com/vi/B9i6UchEogk/default.jpg)
![FOAM CONCRETE, affordable house built in 6 days!](https://i.ytimg.com/vi/2OUgqlzDIrw/default.jpg)
![Installing the dormer staircase](https://i.ytimg.com/vi/qRJ6VjHGpfU/default.jpg)