Загрузка страницы

KeeROO

The KeeROO is simple: cut & fill. Start from a known benchmark – street, curb, landing, etc. For grades there will be at least (2) benchmarks (ex: garage and street). KeeROO without rails to gradually flatten the bedding course between the benchmarks; cutting and filling. The KeeROO is worked in multiple passes from different directions: Perpendicular, parallel and angled. As it's worked between benchmarks a flat and accurate finish grade is achieved. The benchmark area is continuously being expanded. Within a short time there is no more excess material to screed and the bedding course is perfectly flat. Note: for compound grades you screed each plane separately.

Видео KeeROO канала PrbstEquipMgr .NA
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
10 апреля 2019 г. 0:05:00
00:01:01
Яндекс.Метрика