Загрузка страницы

CALAX Update as of March, 2021 From Santa Rosa Interchanges to Agunaldo Highway

00:00 Sub-section 5a - Santa Rosa Interchanges to Silang East Interchanges
08:25 Sub-section 4
11:30 Sub-section 3 (Portion)

Project Description:
The project is a 4-lane 45.29 km. closed-system tolled expressway connecting CAVITEX and SLEX. The project will start from the CAVITEX in Kawit, Cavite and end at the SLEX-Mamplasan Interchange in Biñan, Laguna. The project will have the following subsections:

Project Subsections

Length (km)
1. Cavitex Connection to Open Canal Interchange
8.9
2. Open Canal Interchange to Governor’s Drive Interchange
10.5
3.Governor’s Drive Interchange to Silang (Aguinaldo) Interchange
7.9
4.Silang (Aguinaldo) Interchange to Silang East Interchange
2.9
5.Silang East Interchange to Sta. Rosa-Tagaytay Interchange
5.8
6.Sta. Rosa-Tagaytay Interchange to Laguna Boulevard Interchange
1.8
7.Laguna Boulevard Interchange to Laguna Technopark Interchange
4.2
8.Laguna Technopark Interchange to Mamplasan Toll Barrier
2.9
PPP Scheme: Build-Transfer-Operate

-Private sector to finance, construct, operate and maintain the entire 45.292kms Cavite-Laguna Expressway (CALAx)

Concession Period: 35 years (including 5 years design and construction)


(Tirona Highway to the end of Greenfield Development Corporation Property near Mamplasan Exit, Laguna)

Right of Way:

60 meters, except for Laguna Techno Park &Laguna Boulevard 40 meters, Greenfield Development Corporation 50 meters

Interchanges:

8 grade separated interchanges and 1 toll barrier

Bridges:

12,207 meters inclusive of 4,618 meters of viaduct

Project Objectives:
This project aims to:

support national development policy and provide efficient transport facilities for the Eco-zones in Cavite and Laguna;
reduce traffic congestion particularly in Governor’s Drive, Aguinaldo Highway and Sta. Rosa-Tagaytay Road which are heavily congested;
improve competitiveness of Region IV-A/CALABARZON as an investment destination.
Project Benefits:
At the end of construction, the project is expected to:

Reduce travel time from CAVITEX to SLEX by about 45 minutes
Project Concessionaire:
MPCALA Holdings Inc.

Project Cost:
Activities

Amount (Billion)

Civil Works

P 25.425

Right-of-Way

P 10.201

Independent Consultant (50%)

P 0.056

Total

P 35.682
#ReyPaleria
#MPCALA

Видео CALAX Update as of March, 2021 From Santa Rosa Interchanges to Agunaldo Highway канала ReyPaleria
Показать
Комментарии отсутствуют
Введите заголовок:

Введите адрес ссылки:

Введите адрес видео с YouTube:

Зарегистрируйтесь или войдите с
Информация о видео
11 марта 2021 г. 15:30:16
00:14:38
Яндекс.Метрика